搜档网
当前位置:搜档网 › 登船梯技术规格书 (英文版)

登船梯技术规格书 (英文版)

登船梯技术规格书 (英文版)
登船梯技术规格书 (英文版)

MARITIME TERMINAL OF

COMPLEX

Technical Specification of Gangway

(CHEC NO:13303)

(CLIENT NO:013)

China Engineering Co. Ltd. (C)

September, 2015

Issue status:

CONTENTS

1GENERAL.......................................................................... 错误!未定义书签。

1.1FIELD OF APPLICATION ............................................ 错误!未定义书签。

1.2DEFINITION OF ITEMS............................................... 错误!未定义书签。2REFERENCE DOCUMENTS.......................................... 错误!未定义书签。

2.1APPLICABLE CODES AND STANDARDS............... 错误!未定义书签。

2.2APPLICABLE PROJECT DOCUMENTS .................. 错误!未定义书签。

2.3EXCEPTIONS TO REFERENCE DOCUMENTS .... 错误!未定义书签。

2.4DOCUMENTS ORDER OF PRECEDENCE............. 错误!未定义书签。3SCOPE OF SUPPLY ........................................................ 错误!未定义书签。

3.1EQUIPMENT SUPPLY ................................................. 错误!未定义书签。

3.2EXCLUSIONS................................................................ 错误!未定义书签。

3.3BOUNDARY LIMITS ..................................................... 错误!未定义书签。

3.4ERECTION WORKS..................................................... 错误!未定义书签。4INSTALLATION DATA ..................................................... 错误!未定义书签。

4.1SITE LOCATION AND ENVIRONMENTAL CONDITIONS. 错误!未定义书签。

4.2AREA CLASSIFICATION ............................................. 错误!未定义书签。5GENERAL SERVICE CONDITIONS ............................. 错误!未定义书签。

5.1PROCESS...................................................................... 错误!未定义书签。

5.2OPERATING AND DESIGN CONDITIONS .............. 错误!未定义书签。6DESIGN AND CONSTRUCTION ................................... 错误!未定义书签。

6.1MATERIALS ................................................................... 错误!未定义书签。

6.2DESIGN REQUIREMENTS......................................... 错误!未定义书签。

6.3SWIVEL JOINTS AND STRUCTURAL BEARINGS错误!未定义书签。

6.4QUICK-CONNECT/DISCONNECT CARGO COUPLERS (QCDC)错误!未定义书签。

6.5SPOOL PIECES ............................................................ 错误!未定义书签。

6.6POWERED EMERGENCY RELEASE COUPLINGS (PERC)错误!未定义书签。

6.7ACCESSORIES............................................................. 错误!未定义书签。

6.8OPERATING AND CONTROL SYSTEM DESIGN .. 错误!未定义书签。

6.9PAINTING, MARKING , PACKING AND PREPARATION FOR SHIPMENT................................................................................. 错误!未定义书签。

7INSPECTION AND TESTS ............................................. 错误!未定义书签。

7.1MATERIALS ................................................................... 错误!未定义书签。

7.2FABRICATION CONTROLS........................................ 错误!未定义书签。

7.3SHOP TESTS ................................................................ 错误!未定义书签。

7.4SITE TESTS................................................................... 错误!未定义书签。

7.5CERTIFICATION TESTS ............................................. 错误!未定义书签。

8CRITERIA........................................................................... 错误!未定义书签。

8.1LEAKAGE....................................................................... 错误!未定义书签。

8.2PRESSURE DROP....................................................... 错误!未定义书签。

8.3CONSUMPTIONS OF STEAM ................................... 错误!未定义书签。

8.4LOADS ON SHIP CROSSOVER FLANGES ............ 错误!未定义书签。

9GUARANTEE .................................................................... 错误!未定义书签。

1 General Description

This specification describes the minimum technical requirements for the design, manufacture, testing, inspection and supply of the Gangwayfor MARITIME TERMINAL OF MORON PETROCHEMICAL COMPLEX PROJECT. The suppliers’scope of work sha ll include but shall not be limited to design, fabrication, inspection, testing, preparation for shipment, spare parts, special tools and supply of documentation and manuals. The Gangwayshall be in full compliance with this specification and international standards.

This specification does not list all the technical requirements and standards.

Suppliers should provide the economic, security and high quality products which shall meet the relevant international technology and standards.

Suppliers shall be responsible for the quality of the contract equipment, spare parts and technical performance.

2 Project Overview

2.1 Construction Site:

Moron Petrochemical Complex, Moron, Venezuela

2.2 Project Scale

The gangway will be installed in Berth-2.Berth-2 is designed for chemical tankers from3,000~35,000DWT.

Marine Dimensions:

Berth 1: 39m wide x 277m long with deck top elevation at 6.0mCD.

Vessel Dimensions:

Table 2-1 Design Vessel for Berth-2(Chemical Tankers)

Unit: m

2.3 Site Data

2.3.1 Climate

Maximum temperature recorded 37 °C

Mean temperature 27 °C

Minimum temperature recorded 15 °C

Humidity: Min: 35% Max: 100% Mean precipitation 1030mm

Design precipitation 1402mm

Maximum rainfall in a day 214.3mm

Maximum rainfall in 10 minutes 28.8mm

Design rainfall return period 10 years

Duration 15min

2.3.2 Tides

High Water Level of Spring Tide: 0.52m

Mean Sea Level: 0.0mm

Low Water Level of Spring Tide: -0.39m

2.3.3 Currents

The maximum current velocity is about 0.5m/s.

2.3.4 Wave

●Combined Wave

Table 2-2NNE to ENE direction(propagation wave)

●Swell Wave

Table 2-3NNE to ENE direction(propagation wave)

2.3.5 Wind

Mean wind speed 3 m/s

Maximum wind speed 20 m/s

Prevailing wind direction E 24.8%

E-NE 20%

S 10%

E-SE 6%

S-SO 6.3%

3 Technical Requirements for Personnel Gangways

3.1 Working Range

The gangway for Berth-2 is designed for chemical tankers from3,000~35,000DWT.

3.2 System Overview

The column has a turnable platform at a fixed height which can be reached by access stairs mounted to the side of the main structure. The telescopic gangway is mounted to the turnable platform and after positioning on the vessel’s deck will freely follow all movements within its d esign range without the need for an operator to be present.

The gangway movements are powered by hydraulic cylinders, operated by

a hydraulic control box mounted on the control platform.

Distance from the support location to the ship and operating envelope (“BERTH-2 EQUIPMENT LAYOUT”)

3.3 Technical Requirements

(1)The gangway shall be designed for lifetime of 25 years and for outdoor conditions.

(2)The gangway shall be a telescopic type and shall have a range of vertical and horizontal angels. Its maximum operating angle of inclination is 45degrees.

(3)Main operating condition, walkway supported at both ends.

Design live load on walkway: 300kg/m2

Load on walkway factor:1.0

Wind loading factor:1.0

Mass factor:1.3

Dynamic factor:1.3

(4)44.65kg/mor 90.72kgconcentrated load on handrail.

(5)Clear walkway width: 0.9.

(6)Handrail:1.2m high; constructed of pipe or tensioned cable (rather than rope or chain).

(7)Walkways/steps coated with a non-slip material/hot dip galvanized coating.

(8)Provide electrical insulation to eliminate continuity between the dockand moored vessel (minimum resistance of 1MΩ).

(9)Provide tie-down pad eyes to permit securing to vessel/shore during operation and against motion in the stowed position during high windconditions.

(10)The gangway shall not extend beyond platform facewhen in the stowed position.

(11)The gangway shall permit “free wheeling”when positioned on the vessel and accommodate all vertical and horizontal movements of the vessel (including allowance for surge along the pier and drift off the pier) .

(12)The gangway shall avoid lightning.

(13)The gangway shall not permit mechanical interference with other devices on the pier.

(14)The gangway are operated by hydraulic and explosion-proof electrical system, all controlled by a logically operated control panel.

(15)The seller shall provide complete installation, operation, and maintenance instructions.

3.4 Gangway Design

The gangway design shall be in compliance with the following rules and certifying bodies.

AWS D1-1 (Structural Welding Code –Steel: American Welding Society)

ASTM (American Society of Testing Materials)

AISC (American Institute of Steel Construction)

RINA (The Royal Institution of Naval Architects)

GL Register of Shipping

DNV Rules for the Construction and Classification of Offshore Mobile Units 3.5 Material

ASTM material specification, or equivalent, shall be proposed by the seller for review and approval.

All exposed parts which move relative to each other for the following Marine Arm components shall be corrosion resistant to marine atmosphere, particularly the hydraulic cylinder and motors.

3.6 Corrosion Protection

Every parts of carbon steel should be painted when surfaces are to be prepared by blast cleaning or the use of power tools. Surface preparation and painting should comply with the relevant standards, codes, and references file (Refer toGANGWAY DATASHEET and Engineering Specification for Painting).

3.7 Electrical Description

The electrical system for the entire walkway is distributed by the panels located within the power unit.

All electrical equipments or explosion-proof components must meet the relevant proof grade standards

Required supply voltage: 480 V

Required frequency: 60Hz

4 Inspection and Acceptance

The gangwayseller should be required to provide test report, certificate and other evidences about its operational performance in full compliance with the relevant product quality and technical standards, and also required to submit two volumes inspection reports with sign and date. Test as follows:

-Visual Inspection

-Materials Testing

-Electrical Inspection

-Performance Testing

4.1 Visual Inspection

Purpose is to check whether the appearance of spots on the device, installation, and welding or painting defects.

Main machinery should have a nameplate.

4.2 Materials Testing

Material testing is to determine the purchase of materials, equipment and the technical terms which are consistent with the requirements, the supplier shall issue a certificate to ensure that materials meet the client or standard requirements.

4.3 Electrical Inspection

All tests of electrical equipments should be performed to comply with standards.

4.4 Performance Testing

Welding inspection of main force component should be in accordance with the relevant standards.

5 Scope of Supply

The gangway of supply shall consist of (but not limited) three primary components: the pedestal support structure, the rotating turret, and the telescoping bridge section.

Auxiliary facilities should include electric and control system.

6 Spare Parts

Supplies should provide start-up and commissioning and two years spare parts.

7 Packaging and Transportation

The suppliers should package the gangway to avoid being damaged during transportation.

The suppliers should be responsible for delivering the equipment to the designated terminal.

The suppliers should provide transportation paths. Only transportation program which is agreed by user will be executed.

8 Mark

Each device should be set label clearly, it should be marked:

-Name of Manufacturer

-Device Name and Model

-Performance Parameters

-Product Number and Manufacture Date

9 References

13S038--0101 –BERTH-2 EQUIPMENT LAYOUT

13S038-0304 –GANGWAY DATASHEET

13S038-0006 Engineering Specification for Painting

13S038-0001 BASIS OF DESIGN

10 Documentation

The manufacturer shall submit all three copies of operation & maintenance manuals, product data and shop drawings, material lists, certifications and manufacturing data report, and testresults including installation details of the gangway.

Shop drawings or catalogdata shall besubmitted for the following:

Gangway Hydraulic assembly.

Gangway Electromechanical assembly.

Gangway Structural steel assembly.

Gangway Foundation requirements, civil work and Anchor bolts assembly.

Drawings shall indicate materials, thickness and dimensions, construction and weldingdetail, and surface preparation and finishing notes of steel components.

The manufacturer shall also provide details showing the quality plan and test plan to guarantee performance of the productproposed.

11 Warranty and Replacement Parts

The gangway supplied for the project shall be warranted for a period of 1years from the date of installation. The scope of warranty shall include the gangway being functionally adequate.

The manufacturer shall take steps to ensure that upon receiving notice of failure (either accidental or product related) that replacement electromechanically components will be delivered to the job site within 90 calendar days.

污水处理厂操作规程完整

××污水处理厂一期 操作规程 一、提升泵操作规程 二、转齿格栅操作规程 三、推流器操作规程 四、水解段操作规程 五、缺氧和好氧段安全操作规程 六、二沉池、终沉池操作规程 七、芬顿氧化池操作规程 八、鼓风机操作规程 九、脱水机操作规程

一、提升泵操作规程 (一)启动前检查工作包括: (1)泵池水位,是否在允许开机水位以上 (一般情况下不允许路露出泵头) 。 (2)水中有无可能影响水泵运行的杂物 (3)检查泵机是否安装正确,紧固件无松动,电缆、接线盒正常,进出水闸门是否打开。 (4)检查控制台(柜)开关位置,切换成手动控制状态,检查三相电源电压应在规定幅度内,后续工艺段是否允许进水。 (二)开机 启动前检查完毕后,可以启动水泵电机,将泵控制开关打至就地,再按绿色开启按钮,绿灯亮电源正常。监听泵机声音,若声音正常,则按工艺需要调节闸阀开启量,若开机过程发现有任何不正常现象,不得开机或已开机应立即停机,检查原因,排除故障后才能重新开机,但重新开机必须在电机完全停止15分钟后(泵电机在冷状态下允许连续启动六次),才可重新启动。重复启动仍然不成功,则应按设备故障报告。(泵电机在冷状态下允许连续启动六次。) (三)巡检 巡检时应注意泵池水位、泵池有无杂物,后续工段水位是否在允许范围内,逐台工作机泵的运转声音,检查控制柜,切换开关是否设定在设定的自控或手控位置,机泵管道附属设备及机房、门窗是否正常。巡检频率为接班、交班各一次,其余时间每2小时对现场工艺设

备巡检一次,交班巡检还包括设备、仪表、泵房及泵房周边生责任区的卫生与维护工作,并要记入交接班内容内。 巡检过程中发现问题应立即调整,并记录在记录表中,例如水位低于设定值,应立即停机,若水位高于设定值,应通知中控室及现场负责人增开水泵,在泵运转正常后检查液位计的状况,使之恢复正常;如吸水池有杂物应立即清理,若必须下池清理,则应按“狭小空间内的安全操作要求”操作并通知中控室调人支援与监护,并应检查杂物来源,采取必要措施,防止再发生类似情况;如机泵运转声音不正常,要寻找原因,使其恢复正常。 当天气突变,如暴雨即将来临,则应增加巡检,检查门、窗及采取必要的防水防雷措施。设备初次使用,及经过检查、改造或长期停用后投入运行要增加巡检次数,即增加30分、75分各一次,若一切正常即转入正常巡检每120分一次。 (四)停机操作 检查吸水池水位是否达到停机水位,将切换开关切换至关位置即可。记录停机时的各项参数,如开启时间、泵池液位等。 二、转齿格栅操作规程 (一)操作规程 启动新的或重新投入使用的格栅前应检查: (1)格栅内无杂物 (2)润滑油及润滑油位 (3)格栅具备运行条件

污水处理厂课程设计设计说明书及方案(模版).

1 概述 1.1 工程概况 依据城市总体规划,华东某市在城西地区兴建一座城市污水处理厂,以完善该地区的市政工程配套,控制日益加剧的河道水污染,改善环境质量。该城市现状叙述如下: 1、2号居住区人口3万,污水由化粪池排入河道;3、4号居住区人口5万,正在建设1年内完成;5号居住区人口4.5万,待建,2年后动工,建设周期2年。还有部分主要公共建筑,宾馆5座,2000个标准客房;医院2座,1500张床。以上排水系统均采用分流制系统。同时新区内还有部分排污工厂:电子厂每天排水1500m3,BOD5污染负荷为3000人口当量;食品厂每天排出污水量500 m3,污染负荷为1500人口当量。 旧城区原仅有雨水排水系统,污水排水系统的改造和建设工程计划在10年内完成,届时整个排水区域服务人口将达到18万。 依据上述情况,整个工程划分为近期和远期两个建设阶段,现在实施的工程为近期建设。近期建设周期大概在3年左右,设计服务范围应该包括新区5个已建和待建的居住区、新区内部分主要公共建筑以及2个工厂。依据环保部门以及排放水体的状况,排放水要求达到《城镇污水处理厂污染物排放标准》(GB 18918-2002)一级B标准。 1.2 设计依据 《城镇污水处理厂污染物排放标准》(GB 18918-2002) 《室外排水设计规范》(GB50101) 《城市污水处理工程项目标准》 《给水排水设计手册》,第5册城镇排水 《给水排水设计手册》,第10册技术经济 城市污水处理以及污染物防治技术政策(2002) 污水排入城市下水道水质标准CJ3082-1999 地表水环境质量标准GB3838-2002 城市排水工程规划规范GB50381-2000 1.3设计任务和范围 (1)收集相关资料,确定废水水量水质及其变化特征和处理要求; (2)对废水处理工艺方案进行分析比较,提出适宜的处理工艺方案和工艺流程; (3)确定为满足废水排放要求而所需达到的处理程度; (4)结合水质水量特征,通过经济技术分析比较,确定各处理构筑物的型式; (5)进行全面的处理工艺设计计算,确定各构筑物尺寸和设备选型; (6)进行废水处理站平面布置及主要管道的布置和高程计算; (7)进行工程概预算,说明废水处理站的启动运行和运行管理技术要求 2 原水水量与水质和处理要求: 2.1 原水水量与水质 一期工程: Q=36000m3/d

防水板、止水带技术规格书

渝黔、渝万铁路站前工程隧道防水板、止水带采购招标 招标编号:TW--2013--04 第六章技术规格书

6.1 隧道防水板 1 范围 为规范铁路隧道用防水板技术标准,保证隧道防排水工程质量,特制定本技术条件。 本技术条件规定了铁路隧道防水板的分类、产品标记、技术要求、试验方法、检验规则、标志、包装、运输与贮存。 本技术条件适用于铁路隧道(不含明洞)防排水工程用防水板,包括EVA(乙烯、醋酸乙烯共聚物)、ECB(乙烯、醋酸乙烯与沥青共聚物)、PE(聚乙烯)。 2 规范性引用文件 下列文件中的条款通过本技术条件的引用而成为本技术条件的条款。凡是注日期的引用文件,其随后所有的修改单(不包括勘误的内容)或修订版均不适用于本技术条件,然而,鼓励根据本技术条件达成协议的各方研究是否可使用这些文件的最新版本。凡是不注日期的引用文件,其最新版本适用于本技术条件。 3.1 分类 3.1.1 乙烯、醋酸乙烯共聚物防水板,代号EVA。 3.1.2 乙烯、醋酸乙烯与沥青共聚物防水板,代号ECB。 3.1.3 聚乙烯防水板,代号PE。 3.2 产品标记 3.2.1 产品应按下列顺序标记,并可根据需要增加标记内容: 隧道防水-材料代号-规格(长度×宽度×厚度) 3.2.2 标记示例 长度30m,宽度2.0m,厚度1.5mm的乙烯、醋酸乙烯共聚物防水板标记为:隧道防水-EVA-30m×2.0m×1.5mm 4 技术要求 4.1 原材料

防水板生产用原材料不得使用再生料。 4.2 规格尺寸及偏差 防水板的规格尺寸及允许偏差见表1,特殊规格由供需双方商定。 表1 防水板的规格尺寸及允许偏差 4.3.1 防水板在规格确定的长度内不允许有接头。 4.3.2 防水板表面应平整、边缘整齐,无裂纹、机械损伤、折痕、孔洞、气泡、及异常粘着部分等影响使用的缺陷。 4.3.3 防水板外观颜色应为材料本色,不得添加颜料和填料,特殊要求除外。 4.3.4 在不影响使用的条件下,防水板表面凹痕,深度不得超过厚度的5%。 4.4 物理力学性能 防水板物理力学性能应符合表2规定。 表2 防水板的物理力学性能

技术规格书(中英文)

NPC-National Petro Co. 3600t Revolving/Engineering Crane Technical Specification (Project Plan) Shanghai Zhenhua Port Machinery (Group) Co., Ltd. 2005-12-10 Table of Content

1.1 General Description 总则 1.1.1Consist of the Specification 本规格书组成 The specification including general, hull structure, outfitting, machinery, electrical, refrigerating, air conditioning, ventilating, pipelaying, DP, and crane parts describes the 3600t CRANE PIPELAYING VESSEL based on scheme design. 本规格书由船舶总体、舾装、轮机、电气、通风冷藏空调、动力定位、起重机及铺管设备估价等部分组成,表述3600 t全回转起重工程船的主要技术规格方案。 1.1.2Construction Explanation建造说明 The BUILDER’s supply covers the item described in this specification, anything excluding from the scope of the specification will be supplied by the OWNER. 本船的建造估价,所有规格书所规定的项目均由建造方提供。超过规格书部分船东提供。 1.1.3Language and Measuring Unit文种与计量单位 The drawings, instructions, instruments, display, caution sign and nameplate shall be written in English and kept down the foreign nameplate of the importation of machine and equipments. Metric system is used for designing and fabricating of hull, crane and equipment etc. unless otherwise specialized in specification or instruction. 本船的图纸、使用说明书、仪表、显示、警示牌和铭牌等均以英文书写。进口机械、设备保留原来外文铭牌。 船体、起重机、机电设备等设计和建造,除非在规格书或说明书中特别表明,均采用公制计量单位。 1.2General Description船舶航区及用途 1.2.1The Sailing Area and Functions船舶航区及用途 The vessel is designed as a large-scale all revolving self-propelled vessel. The vessel is used for offshore projects. 本船是一艘自航大型全回转起重工程船,航行于无限航区。 本船主要用于海上海洋工程等作业。 1.2.2Type of Vessel船型 The vessel will be a steel, all welded crane ship with streamline bow, round bilge and bilge keel. A helicopter platform will be situated at forecastle deck. One (1) full revolving crane to be installed in the after area of deck. The vessel will be equipped with two (2) 2000kW tunnel thrusters at bow, two (2) 2500kW retractable azimuthing thrusters at the foreship, two (2) 4500kW azimuthing thrusters at the aftship. The dynamic positioning system is GL DYNPOS–AUTR class. 本船是一艘钢质、全电焊起重工程船。设流线型首,尾部纵向及舭部有圆角,设舭龙骨。船首设居住区及直升飞机起降平台。 船尾设置一台全回转吊机。 首部设2台轴隧式侧推装置,功率2×2000kW;设2台伸缩式全回转螺旋桨推进器,功

污水厂操作规程(正式)

编订:__________________ 单位:__________________ 时间:__________________ 污水厂操作规程(正式) Standardize The Management Mechanism To Make The Personnel In The Organization Operate According To The Established Standards And Reach The Expected Level. Word格式 / 完整 / 可编辑

文件编号:KG-AO-1981-33 污水厂操作规程(正式) 使用备注:本文档可用在日常工作场景,通过对管理机制、管理原则、管理方法以及管理机构进行设置固定的规范,从而使得组织内人员按照既定标准、规范的要求进行操作,使日常工作或活动达到预期的水平。下载后就可自由编辑。 一、安全说明 1、工厂运行期间应优先考虑人身安全与健康; 2、在所有的操作过程中应严格执行操作手册中的安全说明; 3、所有工作人员都需培训上岗,特别是安全培训; 4、所有工作人员都应接受安全知识教育; 5、厂内所有危险区域都应用文字和符号标出; 6、在易燃、易爆区内严禁吸烟、明火,严禁进行产生火花的工作(如焊接等); 7、对生化池和曝气沉砂池要特别注意,由于含有大量的空气而降低了密度,人如果掉进去就很难游上来; 9、对电器设备要引起注意,如电机、开关、电器

装备,特别是高压设备,以防触电; 10、在操作时要做好防护工作,如穿安全鞋、戴安全帽,接触危险化学品要戴防护镜,进入高噪音区域(如鼓风机房)要戴耳塞; 11、用于安全防护的设备(如安全阀、止回阀)不允许拆除和关闭; 12、工艺流程和设备的更改都会造成危险,必须经过许可。 二、水处理部分 污水处理厂设计处理能力为10万m3/d,城市污水,经两条直径1.6米的管道输送到污水厂。处理工艺为A/O工艺。 1、格栅和进水泵房 (1)、粗格栅CS0201-CS0203 每个格栅系统都设有一个控制箱,可就地进行操作和从控制室远距离操纵。为了调整除污频率,由程

污水处理厂课程设计书

广州大学市政技术学院课程设计书 课程设计名称:某城市污水处理厂设计 系部环境工程系 专业 14环境 班级 14环工 姓名邓敏艳 指导教师王昱 2016 年 5 月 30 日

目录 一、课程设计内容说明 (3) 二、设计原始数据资料 (3) (一)城镇概况 (3) (二)工程设计规模: (4) (三)厂区附近地势资料 (4) (四)气象资料 (5) (五)水文资料 (5) 三、课程设计基本要求 (6) 四、课程设计 (6) (一)、计算设计流量 (6) (二)、计算设计格栅 (6) (二)、沉砂池 (9) (三)、曝气池 (10) 1、曝气池的计算与各个部位尺寸的确定 (10) 2、曝气系统的计算与设计 (12) 3、供气量的计算 (13) 4.空气管系统计算 (14) (四)、二沉池设计 (19) 4.1、二沉池池体计算 (19) 4.2、二次沉淀池污泥区的设计 (20) 4.3、二沉池总高度: (21) 五、污水处理厂平面布置图 (22) 六、污水处理厂的高程布置 (22) 6.1、水力损失的计算 (22) 6.1.1、构筑物水力损失表: (22) 6.1.2、污水管道水力计算表: (22) 6.2、构筑物水面标高计算表: (23) 6.3、污水处理厂的高程布置 (23) 七、参考文献资料 (24) 八、总结 (24)

一、课程设计内容说明 进行某城镇污水处理厂的初步设计,其任务包括: 1、根据所给的原始资料,计算进厂的污水设计流量; 2、根据水体的情况、地形和上述计算结果,确定污水处理方法、流程及有关处理构筑物; 3、对各构筑物进行工艺设计计算,确定其型式、数目与尺寸; 4、进行各处理构筑物的总体布置和污水流程的高程设计; 5、设计说明书的编制。 二、设计原始数据资料 (一)城镇概况 该城市地处东南沿海,北回归线横贯市区中部,该市在经济发展的同时,城市基础设施的建设未能与经济协同发展,城市污水处理率仅为3.4%,大量的污水未经处理直接排入河流,使该城市的生态环境受到严重的破坏。为了把该城市建设成为经济繁荣、环境优美的现代化城市,筹建该市的污水处理厂已迫在眉睫。该城镇计划建设污水处理厂一座,并已获上级计委批准。 目前,城镇面积约28Km2,根据城镇总体规划,城镇面积40Km2,其出水进入B江,B江属地面水Ⅲ类水体,要求排入的污水水质执行《污水综合排放标准》(GB18918-2002)中的一级标准中的B类标准,

机械类常用技术要求中英文

常用技术要求 before the feeding control and the wind meets the tube welding, to the good center, in the hole guaranteed that ¢204 the pipeline can pass through. the 进料接管和出风接管焊前对好中心,内孔保证¢204管道能穿过。 welding uses the manual arc welding, welding rod trademark J420G. before the 焊接采用手工电弧焊,焊条牌号J420G。 painting, must carry on the superficial stain removal, the elimination welding residual and so on, its quality scale sees JB/T5000.12 the stipulation; Prime, in Huang He the blue color (according to color model) the polyurethane finishes two. Besides various laps spread the yellow paint, other spread the blue color. In the paint does not allow to contain the lead. Does not allow to have leaks flaws and so on paint, wrinkle paint. 涂装前要进行表面除锈、清除焊接残渣等,其质量等级见JB/T5000.12的规定;涂底漆一层、中黄和中蓝色(按颜色样板)聚氨酯面漆二层。除各盖板涂中黄漆外,其余均涂蓝色。漆中不允许含铅。不允许有漏漆、皱漆等缺陷。 sealants and so on lap like seal lax available CH107, JLC-1 spread in the slit main point. on 盖板如密封不严可用CH107,JLC-1等密封胶涂在缝隙大处。

污水处理厂设计招标文件

目录 第一章招标公告 (2) 第二章投标须知 (5) 第三章合同格式和主要条款 (22) 第四章图纸、技术规范资料及附件 (30) 第五章投标文件部分格式 (31) 第六章附件 (42) 第一章、舞钢市第二污水处理工程勘察、设计招标公告 舞钢市第二污水处理工程已经立项批准建设,河南龙华工程咨询有限公司受舞钢市第二污水处理有限公司的委托,现对该项目的勘察、设计进行公开招标,诚邀愿意承担该项目勘察、设计的潜在投标人前来投标。 一、工程概况 1.1项目名称:舞钢市第二污水处理工程 1.2招标编号:舞财采购【2012】第 20 号 1.3建设地点:舞钢市产业聚集区 1.4建设规模:本项目日处理污水2万吨,项目总占地面积约102亩。排放标准为GB19818-2002《城镇污水处理厂污染物排放标准》中的一级A 标准。 1.5投资规模:投资估算约5789万元。二、招标范围:本次招标内容为舞钢市第二污水处理厂(不含配套污水管网)的勘察、设计招标,日处理污水2万吨,中标单位承担本项目的勘察、设计(含初步设计)。本工程勘察分为一个标段,设计分为一个标段。三、投标人资格要求 3.1对勘察标段潜在投标人资质要求: 3.1.1必须具有独立法人资格; 3.1.2具有建设行政主管部门颁发的勘察综合类资质或专业类(岩土工程)乙级及以上资质的单位; 3.1.3近十年具有承担过类似市政工程项目的勘察业绩; 3.2.4投标人财务状况良好。 3.2对设计标段潜在投标人资质要求:

3.2.1必须具有独立法人资格; 3.2.2具有建设行政主管部门颁发的综合类或市政公用行业(排水工程)设计甲级资质; 3.2.3近十年具有承担过类似市政工程项目的设计业绩; 3.2.4项目负责人具备高级工程师职称; 3.2.5投标人财务状况良好。四、报名时间与地点 4.1报名时间:2012年 5 月 21 日-2012年 5 月 25 日(上午8:30-12:00,下午15:00-17:30) 4.2报名地点:舞钢市财政性资金项目招标投标管理办公室(舞钢市发改委三楼) 4.3报名时须携带: 勘察招标有意向者须携带企业法人营业执照副本(年检合格)、企业资质证书副本、法定代表人携带身份证或授权委托人携带授权委托书及身份证到场,以上证件均须提供原件及加盖单位公章的复印件两套到报名地点报名。未按以上方法报名的,一概不予受理。 设计招标有意向者须携带企业法人营业执照副本(年检合格)、企业资质证书副本、项目负责人职称证书、法定代表人携带身份证或授权委托人携带授权委托书及身份证到场,以上证件均须提供原件及加盖单位公章的复印件两套到报名地点报名。未按以上方法报名的,一概不予受理。 4.4资格审查:报名投标企业不超过七家(含七家)时,则全部参加投标;报名投标企业超过七家时,将通过资格预审的方法确定七家投标企业参加投标。 4.5本次招标不接受联合体投标。五、招标文件的获取时间及地点 5.1招标文件发售时间:另行通知。 5.2招标文件发售地点:舞钢市财政性资金项目招标投标管理办公室(舞钢市发改委三楼) 5.3投标保证金:投标保证金人民币贰万圆整。六、发布公告的媒介:本次招标公告《中国采购与招标网》、《河南招标采购综合网》、《河南省政府采购网》、《平顶山市政府采购网》上发布。七、联系方式 招标人:舞钢市第二污水处理有限公司代理机构:河南龙华工程咨询有限公司联系人:常丽娟联系电话: 传真: 第二章投标须知

橡胶止水带、钢板止水带施工要求

橡胶止水带、钢板止水带施工要求 新建市城南污水处理厂,主要水工构筑物包括:粗格栅问及进水泵站、细格栅问及曝气沉砂池、初沉池集配水井及初沉污泥泵站、初沉池、生物池、二沉池集配水井及二沉污泥泵站、二沉池、中途提升泵站、深度处理车间、接触池、出水泵站等。水工构筑物的施工重点是各种施工缝的处理,否则漏水维修难度很大。为了保证工程质量,增强管理人员的感性认识,项目部组织对莱山水厂进行参观学习。 俗话说:白闻不如一见。通过对莱山水厂的参观学习,感触很深,同时也增长了见识。新建莱山水厂建设规模10万m3/d ,主要有平流沉淀池、过滤池、深度处理单元等水工构筑物。该工程正在施工,通过现场相关人员的介绍,对水平施工缝的预留位置、止水钢板的焊接及安装、止水螺栓的处理、伸缩缝的处理、后浇带同时浇注混凝土的处理方法及施工过程中的注意事项有了初步认识,主要体现在: 一、池壁水平施工缝的施工要求 池壁根据施工条件分两次浇捣:第一次到底板面上50cm高度处与底板同时浇筑,第二次施工至池壁顶面。池壁及隔墙在底板施工前,先在垫层上根据设计图纸意图,用墨线打出池壁中心线及边框线,根据边框线用短钢筋打入控制定位,绑扎钢筋,调整标高支立棋板,完成后与底板一次浇筑。第二次在立模前先对 5 0cm处的施工缝修凿、活洗后立模

池壁水平■施工缝位置 二、池壁水平■施工缝的施工要求 池体施工底板时,池壁上翻500mm留水平■施工缝,缝按设计要求设钢板止水带,止水带表面油污、铁锈提前活除干净,并检查不得有裂口、脱焊现象。止水带宽度为 350mm,每边埋入碌不少丁150mm。钢板止水带纵向采用搭接焊, 搭接长度不小丁50mm。

诺瓦科技LED接收卡MRV220-15规格书英文版

Specifications Receiving Card MRV220-15 Product images provided in this file are for reference only , and the actual products shall prevail. Rev1.0.1 NS110100270 X I ' A N N O V A S T A R T E C H C O ., L T D .

Features MRV220 is the receiving card of Nova with 28-group data mode. It has the following features: 1) Single card outputs 24-group of RGB data; 2) Single card outputs 28-group of RGB data; 3) Single card outputs64-group of serial data; 4) Single card support resolution 256x226; 5) Configuration fileread back; 6) Temperature monitoring; 7) Ethernet cable communication status detection; 8) Power supply voltage detection; 9) Pixel-by-pixel brightness and chromaticity calibration, Brightness and chromaticity calibration coefficients for each LED; 10) Supports dual power backup function: It supports two-way power detection and screen brightness will be adjusted automatically when power failure occurs in any way of the power. NOTE: PWR1_S and WR2_S default to normal. Power shall be guaranteed to be pulled down to GND after power failure occurs; 11) Comply with RoHS standard; 12) Comply with EU CE-EMC Class A standard. X I 'A N N O V A S T A R T E C H C O ., L T D .

污水处理厂运行操作规程

污水处理厂运行操作规程 总则 1.为加强污水处理的设备管理、工艺管理和水质管理,保证污水处理安全正常运行,达到净化水质、处理和处置污泥、保护环境的目的,制定本规程。 2.污水处理的运行、维护及其安全除应符合本规程外,尚应符合国家现行有关标准的规定。 1一般要求 运行管理要求 1.运行管理人员必须熟悉本厂处理工艺和设施、设备的运行要求与技术指标。 2.操作人员必须了解本厂处理工艺,熟悉本岗位设施、设备的运行要求和技术指标。 3.各岗位应有工艺系统网络图、安全操作规程等,并应示于明显部位。 4.运行管理人员和操作人员应按要求巡视检查构筑物、设备、电器和仪表的运行情况。 5.各岗位的操作人员应按时做好运行记录。数据应准确无误。 6.操作人员发现运行不正常时,应及时处理或上报主管部门。 7.各种机械设备应保持清洁,无漏水、漏气等。 8.水处理构筑物堰口、池壁应保持清洁、完好。 9.根据不同机电设备要求,应定时检查,添加或更换润滑油或润滑脂。 安全操作要求 1.各岗位操作人员和维修人员必须经过技术培训和生产实践,并考试合格后方可

上岗。 2.启动设备应在做好启动准备工作后进行。 3.电源电压大于或小于额定电压5%时,不宜启动电机。 4.操作人员在启闭电器开关时,应按电工操作规程进行。 5.各种设备维修时必须断电,并应在开关处悬挂维修标牌后,方可操作。 6.雨天或冰雪天气,操作人员在构筑物上巡视或操作时,应注意防滑。 7.清理机电设备及周围环境卫生进,严禁擦拭设备运转部位,冲洗水不得溅到电缆头和电机带电部位及润滑部位。 8.各岗位操作人员应穿戴齐全劳保用品,做好安全防范工作。 9.应在构筑物的明显位置配备防护救生设施及用品。 10.严禁非岗位人员启闭本岗位的机电设备。 维护保养要求 1.运行管理人员和维修人员应熟悉机电设备的维修规定。 2.应对构筑物的结构及各种闸阀、护栏、爬梯、管道等定期进行检查、维修及防腐处理,并及时更换被损坏的照明设备。 3.应经常检查和紧固各种设备连接件,定期更换联轴器的易损件。 4.各种管道闸阀应定期做启闭试验。 5.应定期检查、清扫电器控制柜,并测试其各种技术性能。 6.应定期检查电动闸阀的限位开关、手动与电动的联锁装置。 7.在每次停泵后,应检查填料或油封的密封情况,进行必要的处理。并根据需要填加或更换填料、润滑油、润滑脂。 8.凡设有钢丝绳的装置,绳的磨损量大于原直径10%,或其中的一股已经断裂时,

(完整版)a2o工艺污水处理厂毕业设计说明书1

污水处理A2\O工艺 摘要 本次毕业设计的题目为新建城市污水处理厂设计(15万m3天)工艺。主要任务是完成个该地区污水的处理设计。 其中初步设计要完成设计说明书一份、污水处理厂总平面图一张及污水处理厂污水与污泥高程图一张;单项处理构筑物施工图设计中,主要是完成平面图和剖面图及部分大样图。 该污水处理厂工程,规模为15万吨日。 A2O工艺的生物处理部分由厌氧池、缺氧池和好氧池组成。厌氧池主要功能是释放磷,同时部分有机物进行氨化。缺氧池的主要功能是脱氮。好氧池是多功能的,能够去除BOD、硝化和吸收磷。 该污水厂的污水处理流程为:从泵房到沉砂池,进入反应池,进入辐流式二次沉淀池,再进入清水池,最后出水;污泥的流程为:从反应池排出的剩余污泥进入集泥配水井,再由污水泵送入浓缩池,再进入消化池,最后进入脱水机房脱水,最后外运处置。 关键词:A2O;同步脱氮除磷;设计说明书

Abstract The topic of this graduate design is about the design of the sewage disposal plant in the area of a City. The technics of the plant is the Anaerobic-Anoxic-Oxic. The main task is the primary design of the plant . The task of the primary design is that a design book、a plan of the plant、the the single disposal build design ,the plane drawing、the plan and some part magnifying drawings of the Anaerobic-Anoxic- Oxic. The construction of this plant is 160000 tones a day. T-oxidize ditch and unoxidize pool are two important part and water flows into three ditchs in turn, also T-oxidize ditch plays the role of secondary settling. The unoxidize pond release phosphorus. Along with aeration distance, the dissolved oxygen density reduces. This make oxidize area and unoxdize area present in ture. Namely appears the nitration and the counter- nitration process in succession , get the result of denitrogenation. At the same time the fine oxygen district absorbs the phosphorus, get the result of getting rid of phosphorus. The process of the sewage in the plant is that: The sewage runs from pump tank, enters disinfection pond, then enters calculation trough ,at last lets out. The process of the sludge is that: Surplus sludge from the sedimentation tank enters concentration pond, enters digestion pond , enters automatically translated text: then enters automatically translated text:, at last it is carried out of the plant. Key words:The Anaerobic-Anoxic-Oxic; Taking off the nitrogen and the phosphorus; Automatically translated text.

钢板止水带

关于止水钢板的连接及固定的问题 关于止水钢板我有以下疑问: 1、止水钢板一般裁多长合适? 2、止水钢板焊接连结时的搭接长度是多少?其焊接要求是什么? 3、止水钢板焊接连接接缝可以在转角出么? 4、固定止水钢板的钢筋可以直接焊接在结构钢筋上? 5、止水钢板连接及其固定有没有什么规范可以做依据? 止水钢板的施工技术 1、钢板止水带和橡胶止水带相比,优点不如橡胶止水带,一个最明显的缺点就是生锈,后期处理麻烦,所以尽可能采用橡胶止水带施工; 2、原材料问题,钢板止水带不是成品,是由三块规格不一样的钢板焊接而成,但施工单位一般都是买专业厂家加工制作好的成品,但焊接质量及原材料质量直接影响止水效果; 3、安装方向问题,无论是水平钢板止水带还是竖向钢板止水带,一定要使两翘曲面安装方向朝迎水面; 4、止水带一般都是安装在后浇带位置、有防水要求的地下室侧墙板分隔缝或施工缝处,暴露在外周期长,要做好防护处理,比如说涂刷防锈漆等措施;

止水钢板的作用 GB50141-2008中6.1.10规定金属止水带搭接长度不得小于20mm,且必须使用双面焊接。

首先,止水带不仅仅是用在剪力墙上的; 其次,一般止水带是用在地下室的; 第三,需要设止水带的地方都是混凝土不能一次浇筑,需要分开时段浇的地方,原因是这些地方会有缝隙,不做处理会有水源源不断的渗到室内,所以需要用止水带,以达到密封的目的。 止水带设在有防水要求的地方。 在实际工程设计和使用角度上讲,止水带主要是用于混凝土的变形缝、伸缩缝、沉降缝以及施工缝等处,而止水条一般是混凝土构筑物的水平施工缝处使用的,从结构形式上讲,止水带一般为有中心孔的带状橡胶体,而且在中心孔两侧均匀布置了若干道防水线,这些防水线在浇注混凝土的时候,与混凝土紧密结合,延长了水的绕渗线路,并且靠橡胶本身的弹性和中心孔的变形量来适应混凝土的伸缩变形,属于结构型止水材料,而止水条一般为遇水膨胀型,就是说在施工缝处,在后浇混凝土浇注之前放置在混凝土的接缝处,这样后期如果有水进入到施工缝后,这个材料会遇水膨胀,从而填满整个缝隙,以达到止水的效果,属于功能型止水材料. 遇水膨胀橡胶止水带就是把这两种材料的优点聚于一体的一种新型防水材料,从而使防水效果更佳,是一种既能结构型防水,又能

污水处理厂设计说明书

污水处理厂设计说明书

前 言 伴随着中国城市化进程的加快,中国必须提高环保意识,逐步扭转社会发展进步与保护环境之间的矛盾,努力构建社会主义和谐社会。 现有自贡市大山铺镇为缓解城市发展与环境污染之间的矛盾,改善居民生活环境,提高城市形象,改善投资环境,需要设计一套城市排水系统,完善城市排水管网体系,将城市生活污水与工业废水集中至污水厂处理。 经过对该城市地形、道路分析,本工程采用分流制排水体制;对该市污水水质水量以及相应的出水标准的分析,采用SBR 工艺对污水进行生化处理,可以同步实现去除BOD 、脱氮、除磷。水厂来水水质为:BOD 5=150~230 mg/L ,COD Cr =250~350 mg/L ,SS=200~350mg/L ,NH 3-N=20~40mg/L ,总磷 =3.2~4.3mg/L ,TN=35~50mg/L ,pH=6.5~8.0,水温12~28℃。经城市污水处理厂处理之后要求出水水质达到《城镇污水处理厂污染物排放标准》GB18918-2002一级标准的B 标准要求如下:CODcr ≤60 mg/L 、BOD5≤20mg/L 、SS ≤20 mg/L 、NH 3-N ≤8mg/L 、TN ≤20mg/L 、TP ≤1.0 mg/L 。污水处理过程 包括:污水总泵站——格栅——沉砂池——初沉池——SBR 生化池——消毒接触池——巴氏计量槽。污泥处理过程包括:浓缩池——贮泥池——消化池——脱水间。由于在浓缩池、贮泥池、消化池中污泥的停留时间过长,上清液中含有大量的磷,故而需要将上清液加以处理。处理后的上清液回流至泵站,产生的泥渣作为生活垃圾卫生填埋或则用作农用肥。 关键字:分流制、污水处理;SBR ;脱氮

诺瓦科技LED控制器MCTRL600规格书英文版

Specifications Independent Controller MCTRL600 V2.1.0 NS110100121 X i ’a n N o v a S t a r T e c h C o ., L t d .

Overview MCTRL600 is an advanced model of Nova controllers, which supports extra-large resolution. With HDMI/DVI video input and four Ethernet port outputs, a single unit is able to load 2560×960. Multiple units can be cascaded for uniform control. Feature 1) HDMI/DVI input; 2) HDMI/external audio input; 3) 12bit/10bit/8bit HD video source; 4) Resolution supported: 2048×1152,1920×1200,2560×960; 5) Resolution supported: 1440×900 (12bit/10bit); 6) 1 light sensor interface; 7) Cascading supported; 8) 18bit gray scale processing and presentation; 9) Video format: RGB, YCrCb4:2:2, YCrCb4:4:4; 10) Standard 1U housing and independent power supply. X i ’a n N o v a S t a r T e c h C o ., L t d .

污水处理厂设施设备安全操作规程

安全操作规程 进水泵房安全操作规程 一、污水入池前准备 1.根据调度指令,及时开启指令中规定设备。 2.开启闸门启闭器,如用电关启时,则手柄必须脱离转动轴,如用人力时,关掉电源将手柄插入摇动。 3.闸门启闭机开闭时应守机使用,待停机后可离开机旁,绝不允投入运行后,随即离开。 4.开启旋转格栅应格按照旋转格栅使用要求执行,并守机十分钟,检查机械设备有无异常情况后可离机,绝不允投入运行后,随即离开。 5.在池水位达到工艺规定标高时,可启动水泵,同时根据水池水位情况与值班调度取得联系。 二、起动、运转 1.按调度指令打开切换井的进出水闸门,关闭其他各闸门。 2.水泵启动前,应向填料函上的接管,引注清水润滑橡胶轴承,待泵出水后即可关小,有水滴出为宜,检查泵轴承位的油位,确保各处水、油路畅通。 3.水泵启动前检查各连接部位应无松动,用手转动联轴器,看是否灵活,泵是否有响声。 4.水泵启动时,机旁不得站人,启动后应至少守机五分钟检查设备情况,如有不正常的振动和声音或出水情况有异常应立郧停机检查,绝不允投入运行后随即离开机泵。 5.水泵在运行中,应注意以下事项: (1)检查各个仪表工作是否正常、稳定,特别注意电流表是否超过电动机额定电流,电流过大,过小应立即停机检查。 (2)水泵流量是否正常,检查出水管水流情况,根据水池水位变化,估计水泵运行时间,及时与调度联系。 (3)检查水泵填料压板是否发热,滴水是否正常,每班不得少于八次。 (4)注意机组的响声,振动情况。 (5)检查轴承电机温升情况,发现异常应立即停机,通知值班调度。 (6)检查格栅及进水口是否堵塞,水位是否过低。 6.水泵电动机在冷状态下一般允连续起动六次,两次间隔时间至少十五分钟。 三、停机 1.达到工艺要求或接受调度指令,应立即停机,关闭其闸门,停机后,应把使用设备擦洗干净,设备围打扫干净。 2.冰冻季节停机后,应排除泵积水,以免损坏零件。 3.备用泵应每星期用手旋转泵轴180°,并注意轴承处油位标记,及时加油。 四、检修泵、潜水泵、通风机的使用 1.检修泵应按生产科规定开启,在未使用时保证清洁、完好。 2.潜水泵应注意水池水位情况,应即时开启,人不离机,池净即停。 3.通风机按操作人员运行经验进行启闭。

技术规格书模板

技术规格书模板 -标准化文件发布号:(9456-EUATWK-MWUB-WUNN-INNUL-DDQTY-KII

中国石油大庆炼化公司 技术规格书 (物资名称:) 编制人:(专业厂或业务管理部门签字)年月日审核人:(专业厂单位领导签字)年月日 审批人:(业务管理部门领导签字)年月日

目录 1.总则 2. 执行标准 3. 主要技术要求 4. 检验和试验 5. 包装及运输 6. 资料交付 7. 技术服务及售后保证 8. 其它 附件供货范围 1.总则

1.1 本技术规格书适用于大庆炼化公司物资招标,提出了该物资生产、检验、试验、验收、运输、试用和售后服务等方面的基本技术要求; 1.2 投标人所供物资的材料、制造、检验和试验,按标准的最新版本要求执行;其它未列出的与本产品有关的规范与标准,投标人有义务在投标文件中列出。投标人应对所供产品质量承担全部责任。 1.3 在所有技术文件中的文字和计量单位,采用中文(中英文对照)和国际SI单位。 1.4 投标人所采用的专利涉及到的全部费用均被认为已经包含在报价中,投标人承担所提供的设计、制造过程中所涉及的各类专利技术的法律责任。投标人保证所采用技术不侵犯 任何第三方权益,如引发知识产权方面相关的法律纠纷,由投标人负全责。 2. 执行标准: 标准名称:下列标准或规范应为国家标准、行业标准或集团公司标准(不能为供应商企业标准)。 例:GB/T 14976 液体输送用不锈钢无缝钢管 GB/T 14975 结构用不锈钢无缝钢管 ………… 3. 主要技术要求(如有) 针对于标的物的具体要求,在本条列出。 例如具体参数要求,形式形状要求,特殊材质要求等。 4. 检验和试验(如有) 有标准的执行标准 例:执行GB/T 14976检验标准) 4.1 生产过程检验要求(如有) 例:需提供生产过程检验报告 4.2 出厂检验要求(如有) 例:需提供出厂合格证 4.3 第三方检验要求(如有) 例:需提供省级以上质量监督部门检测机构报告 4.4 购买招标文件后递交投标样品要求、试验要求(如有) 填写详细的递交样品方式、数量、包装、检验流程、报告出具等详细要求。 例:需提供样品一份。0.5L瓶装,开标前送至招标管理中心负责人处。 4.5 到货验收要求(如有)

相关主题