搜档网
当前位置:搜档网 › APICS_ECO 经典350题库

APICS_ECO 经典350题库

APICS_ECO 经典350题库
APICS_ECO 经典350题库

1-1Backlogs should be held:

A) On the shop floor

B) At the customer

C) In production control

D) In the warehouse

The correct answer is C)

By keeping the backlogs in production control, the floor will

not be overloaded with work which cannot be completed,

thereby rendering due dates invalid on the floor. When the

shop is overloaded, product gets moved more frequently

and changeovers become more frequent, reducing the

available capacity.

1-2The time period which exists between the completion

of one operation and the start of the next operation is:

A) Wait time

B) Set-up time

C) Interoperation time

D) Pre-operation time

The correct answer is C)

Interoperation time includes move time, queue time, and

wait time.

1-3Which of the following is associated with backward

scheduling?

A) Finite loading

B) Infinite loading

C) Interoperation sequencing

D) Dispatch lists

The correct answer is B)

With infinite loading, the load on the plant is determined by

the customer due date scheduled backward without regard

to standard capacity available to perform the work.

Capacity is then reviewed for potential improvements

through overtime, subcontracting, etc.

1-4Given the following information for a work center:

Machines = 3

Operations per shift = 2

Shifts per day = 1

Days worked per week = 5

Hours worked per shift = 8

Machine utilization = 80%

Operator efficiency = 90%

If the hours worked were increased to a 10 hour shift

from an 8 hour shift, what would the available capacity

be for the week?

A) 100

B) 108

C) 120

D) 150

The correct answer is B)

Available weekly capacity would be 3 machines x 50 hours

per week x .80 machine utilization x .90 operator efficiency

= 108.

2-1Which of the following is affected when input does not

match output?

I. Lot sizes

II. Lead times

III. Queue sizes

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is C)

If input is greater than output, queues and lead-times will

increase; if output is greater than input, they will decrease.

2-2The JIT philosophy calls for reducing lot sizes. Which

of the following would represent a good way to cut lot

sizes?

A) Reduce the lot size to one and identify the

problems

B) Cut the lot size in half and solve the problems that

surface

C) Cut the lot size in half but be sure inventory is on

hand in case the problems can't be resolved

D) Cut the lot size to equal one week's production

The correct answer is B)

By cutting the lot sizes in half, some problems will surface

to solve; however, there won't be so many that you

cannot deal with them. When the problems created by

the first lot size reduction are resolved, cut the lot sizes

again for more problems to surface. This is the "one less

at a time" process of gradually reducing lot sizes.

2-3Which of the following best describes the results of total

quality control?

A) Statistical tests of production identify sources of

defects.

B) The number of inspection stations is decreased in the

production process.

C) The product is made right the first time.

D) The cost of scrap and rework is below budget.

The correct answer is C)

2-4An operator falls behind the flow and a small bottleneck

occurs at a workstation. The operator switches on the

signal light, and the two operators at the adjacent

workstation immediately move in to help. Soon, the

bottleneck is relieved, and the two return to their

workstations. The procedure described above includes

examples of all of the following EXCEPT

A) Leveling. B) Teamwork.

C) Visibility. D) Flexibility.

The correct answer is A)

2-5The main objective of line balancing in an assembly

operation is to

A) Provide maximum mobility of operators between

assembly lines.

B) Minimize the total number of parts required for each

assembly line.

C) Develop work standards for cost-estimating purposes.

D) Distribute the work to maximize line output.

The correct answer is D)

3-1Which of the following will be reduced through small lot

manufacturing?

I. Work-in-process inventory

II. Defective parts produced

III. Machine operator skills

A) I and II

B) I and III

C) II and III

D) I, II, and III

The correct answer is A)

Small lot manufacturing will reduce work-in-process

inventory and increase quality so the number of defective

parts produced is lower. In order to do this, operator skills

will have to increase to include functions such as problem

solving and Statistical Process Control.

3-2Often, dissimilar machines will be grouped into U

shaped cells. The benefit(s) from organizing the

manufacturing in this manner is/are:

I. Leadtimes are shortened

II. Floor space taken is much less

III. Machine downtime is reduced

IV. Work-in-process inventory is lower

A) I, II, and IV B) I, III, and IV

C) II, III, and IV D) I, II, III, and IV

The correct answer is A)

The reasons for creating a U shaped cell are many.

Because the space required is less, the leadtimes are

shortened and there are no queues formed inside the cell.

Additionally, this reduction in queue and the lack of

inventory inside the cell also causes the inventory to

decrease. Unfortunately, machines can still break down

unexpectedly, even if a good preventive maintenance

program is in place.

3-3In order to monitor the capacity requirements plan,

which of the following techniques would be used?

A) Finite loading

B) Rough-cut capacity control

C) Input/Output control

D) Critical ratio

The correct answer is C)

Input/output control ensures that only work which can be

completed is planned for the given work center. The

output is compared to the input so planned output equals

or exceeds planned input. Actual results are measured

against the plan.

3-4------------------------------------------------

WORK CENTER 210 (in standard hours)

------------------------------------------------

1 2 3 4 5

PLANNED INPUT 150 150 150 150 150

ACTUAL INPUT .150 145 130

CUMULATIVE 0 -5 -25

DEVIATION

------------------------------------------------

PLANNED OUTPUT 180 180 180 180 150

ACTUAL OUTPUT .185 140 160

CUMULATIVE +5 -35 -55

DEVIATION

------------------------------------------------

Based on the input/output control chart above, backlog

is planned to be reduced by:

A) 90 hours

B) 120 hours

C) 150 hours

D) No reduction

The correct answer is B)

Output was planned to be 30 hours higher than input for 4

weeks for a total of 120 hours.

4-1Which of the following best describes the technique,

"Critical Ratio"?

A) It helps plan capacity

B) It helps with priority planning

C) It determines when to change the MPS

D) None of the above

The correct answer is B)

It helps determine priorities by finding the ratio between

time remaining and work remaining. If the ratio is less

than 1.0, it indicates being behind; if the ratio is greater

than 1.0, it indicates being ahead of schedule.

4-2Department A produces part XYZ in 4 operations.

During the prior month, the department earned 1200

standard hours by producing 1000 parts. The

department worked 1000 hours to produce these parts.

What is the department efficiency?

A) 83%

B) 100%

C) 120%

D) 200%

The correct answer is C)

Efficiency is determined by dividing the standard hours

earned by the actual hours worked or: 1200/1000 = 1.20

or 120%.

4-3In the XYZ widget company, every piece of a given lot

must be finished before any piece of the lot is

processed at the following work center. This company

is running:

A) A gapped schedule

B) A finite schedule

C) A detailed operation schedule

D) An infinite schedule

The correct answer is A)

A gapped schedule is run when every piece in a lot is

finished before being processed into the next operation.

This causes gaps in time between the end of one

operation and the beginning of the next operation.

4-4Inventory shrinkage has occurred when physical inventory

dollars are less than book inventory dollars. What

is the effect of inventory shrinkage on a company's profit

and loss statement?

A) Decrease in the cost of goods manufactured.

B) Increase in inventory dollars.

C) Decrease in sales dollars.

D) Decrease in profits.

The correct answer is D)

4-5Network analysis (PERT/CPM) is a scheduling technique

used primarily in

A) Job shops where many alternate routings are possible.

B) Continuous process companies using flow control.

C) Companies working on projects that have fairly

well-defined beginnings and endings.

D) Companies using computer-aided manufacturing (CAM)

applications.

The correct answer is C)

5-1The process of spreading orders or rescheduling

operations so the work is distributed evenly is known

as:

A) Operations scheduling

B) Infinite loading

C) Load leveling

D) Backward scheduling

The correct answer is C)

Load leveling involves spreading orders or re-scheduling

operations so the work is distributed evenly and can be

achieved. This ensures the factory is not overloaded for

two weeks and idle the next two, for example.

5-2In a sequence of operations without alternate routings,

capacity and the whole sequence of operations can be

scheduled by the operation with the least capacity.

This operation is known as:

A) The gateway operation

B) The limiting operation

C) The downstream operation

D) The sequencing operation

The correct answer is B)

The limiting operation, also known as the bottle-neck

operation, can be used to schedule the whole sequence of

operations since work can only proceed as fast as the

slowest point.

5-3In a job shop environment, which of the following are

true?

I. Less work in process inventory increases lead times

II. Longer queues increase lead times

III. More work-in-process means increased lead times

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is C)

The more work held on the production floor, the longer the

lead-time will be. This happens because jobs begin to get

moved to meet customer demands. The result is that parts

get moved and shuffled, reducing capacity.

5-4Which of the following will be true if the cumulative

lead-time of a product is longer than the MPS planning

horizon?

A) Orders for long lead-time components will be

released late

B) Orders for long lead-time components will be

released early

C) Order point can be used for the longest lead time

items without affecting priorities

D) There is no impact

The correct answer is A)

The orders for the long lead-time components will be

released late as visibility will not be far enough into the

future.

5-5In a job shop environment, which of the following

elements of lead-time is generally the greatest?

A) Queue time

B) Run-time

C) Set-up time

D) Move time

The correct answer is A)

Queue time is the time a job waits at a work center

before work on set-ups are performed on the job. By

reducing queue time, manufacturing lead-time can be

shortened. This is quite often the longest portion of the

leadtime in a factory.

6-1The plant manager is responsible for:

I. Manufacturing to meet a schedule

II. Changing the schedule

III. Ensuring raw materials arrive in time

A) I

B) I and III

C) I and II

D) II and III

The correct answer is A)

The plant manager is responsible for ensuring products are

produced to meet the schedule in the priority assigned with

the best quality possible at the least cost possible.

6-2A job status report would show:

A) Costs accumulated for the job

B) The input and output of every work center

C) The plan for completing a job and the progress

versus the plan

D) The job priority at each work center

The correct answer is C)

A job status report shows the actual progress of a job

versus the completion date.

6-3An effective technique in a JIT environment to increase

management and staff involvement in the production

process is

A) Excepting reporting

B) Viewing operations through hidden TV cameras

C) Routine briefings by direct labor employee

D) Frequent plant walk-throughs

The correct answer is D)

6-4A primary role of a quality-assurance department in a

JIT environment is

A) Inspection of incoming goods

B) Sorting our defects on the assembly line

C) Training operators on process quality techniques

D) Cleaning and lubricating equipment

The correct answer is C)

6-5A major requirement for "making a little of each

product each day" is

A) No options are allowed

B) The use of cards or other signaling devices

C) Level customer demands

D) Quick set up and changeover

The correct answer is D)

7-1If a work center is becoming a bottleneck and

throughput time is getting longer, which of the following

could be a solution?

I. Decrease the input

II. Increase the planned lead times

III. Increase the capacity

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is B)

Essentially, the only way to relieve the bottle-neck is to

increase the output from the work center or decrease the

input. Increasing planned leadtimes will cause more work

to be released to the floor.

7-2Which of the following statements are true regarding

queues?

I. Queue size and lead time are interchangeable

II. Queue size and lead time are interconnected

III. Queue time is variable based on priority

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is C)

Queue size and lead time are interconnected since an

increase in queue size will increase lead time. However, if

a jo

b is a high priority by management, the queue size

won't matter.

7-3Which of the following best describes the term alternate

routing?

A) A routing similar to the primary routing which

produces an identical item of lesser quality

B) A routing less preferred to the primary routing which

produces an identical item

C) A routing which takes longer than the primary

routing and produces a similar, but not identical part

D) A routing for the supplier which exists on the

customers file

The correct answer is B)

An alternate routing is not preferred over the primary

because the machinery could be older, more variable, or

may take longer. However, the identical part is produced

within the quality specification.

7-4Given the following information on a work center:

Machines = 3

Operations per shift = 2

Shifts per day = l

Days worked per week = 5

Hours worked per shift = 8

Machine utilization = 80%

Operator efficiency = 90%

If the weekly load on the work center is 90 hours, the

work center is:

A) Overloaded

B) Underloaded

C) In balance

D) Not enough data

The correct answer is A)

The work center is overloaded because the standard

capacity is 3 machines x 40 hours per week x .80

machine utilization x .90 operator efficiency = 86 standard

hours.

8-1A replacement for a normal step in the manufacturing

process is:

A) Alternate routing

B) Smoothing

C) Alternate operation

D) Sequence

The correct answer is C)

An alternate operation would be used if the normal

operation was not running, so work could be completed.

8-2If more input is arriving at a work center than output

leaving the work center, which of the following will

occur?

I. Backlogs will grow

II. Lead-times will be longer

III. Work-in-process inventory will be higher

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

All of the answers will occur if more is input to the factory

or work center than can be expected out.

8-3When a set-up procedure occurs while a machine is

running, it is called:

A) Internal set-up time

B) Interoperation time

C) External set-up time

D) Gapped time

The correct answer is C)

External set-up time occurs when a set-up is completed

while the machine is operating. Internal set-up time

occurs when the machine is down.

8-4Based on the following information, calculate the

machine utilization for a 5-day week based on 8 hour

shifts (times are expressed in hours).

Day 1 Day 2 Day 3 Day 4 Day 5

Set up time 1.0 1.0 1.5 1.0 1.5

Run time . 6.0 5.5 5.5 6.0 5.5

Wait time 1.0 1.5 1.0 1.0 1.0

A) 71.25% B) 86.25%

C) 91.25% D) 97.50%

The correct answer is B)

Machine utilization is calculated by dividing direct time

charged to production activities by the clock time scheduled

for those production activities. In the question, 8 hours are

available each day or 40 hours for the week. Set up and

run time accounts for 34.5 hours or 86.25% (34.5/40.0).

8-5Which of the following are scheduled in manufacturing

lead time?

I. Time to purchase

II. Queue time

III. Run time

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is C)

Purchasing raw materials is not part of the manufacturing

lead time, but is part of the cumulative lead time.

9-1By increasing the capacity at the bottleneck work

center, which of the following will occur?

I. Manufacturing lead-times will be shortened

II. Work in process inventory will be reduced

III. Scrap will be reduced

A) I and II

B) I and III

C) II and III

D) I, II, and III

The correct answer is A)

By increasing the capacity at the bottleneck work center,

more work can "flow" out of the work in process. When

this happens, lead-times will decrease, as will work in

process. While scrap could be lower due to damage

caused by excess parts in the factory, it is not a direct

result.

9-2In which of the following businesses can shop floor

control procedures be best applied?

I. Make-to-stock

II. Make-to-order

III. Assemble-to-order

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

All types of manufacturing industries can receive benefits

from shop floor control procedures although each of them

have very specific issues.

9-3Effective shop floor controls can improve customer service

in which of the following ways?

I. By reducing production lead time

II. By replenishing stock orders on schedule

III. By improving parts availability

A) I only B) I and III only

C) II and III only D) I, II, and III

The correct answer is D)

9-4Which of the following are among the characteristics of

flow control scheduling?

I. Measuring movement past control points

II. Knowing capacities and planned rates

III. Matching work in process to specific customers

A) I and II only B) I and III only

C) II and III only D) I, II, and III

The correct answer is A)

9-5When allocated on the basis of historical direct labor

hours, overhead will be properly absorbed if which of

the following is true?

A) Total volume increases.

B) Total volume decreases.

C) Total volume remains unchanged.

D) Fixed costs decrease.

The correct answer is C)

10-1The most significant factor affecting the difference between

planned lead time and actual lead time for a specific

order or batch in a shop is

A) Priority

B) Capacity

C) Queues

D) Component availability

The correct answer is A)

10-2In Plant X, flow of purchased parts is from receipt at

dock to receiving/inspection to receipt at stores. In the

MRP system, inventory on hand is increased when

material is received at stores. Which of the following

statements are true about this situation?

I. A supplier delivery performance measurement should be

based on actual receipts at dock versus schedule.

II. Purchase orders should be closed when all parts are

received at stores.

III. A resource constraint could cause parts to be received at

the dock but not into the stores on schedule.

A) I and II only B) I and III only

C) II and III only D) I, II, and III

The correct answer is D)

10-3Employee involvement is the concept of using

A) Managerial employees to perform nonmanagerial tasks

whenever they are idle.

B) Employees to perform jobs outside of their assigned

duties without prior consent.

C) Employees' creative energy and intelligence in

certain decision-making processes.

D) All of the above.

The correct answer is C)

10-4Which of the following can be included as benefits of

cellular manufacturing?

I. Reduced order flow time

II. Lower setup time

III. Lower material handling costs

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

All of the answers can be included as benefits, in addition

to improved quality, less work-in-process, and improved

job satisfaction.

11-1In a just-in-time production environment, a ship-to-WIP

process is generally implemented as part of the JIT

project. Which of the following best describes the

ship-to-WIP process?

A) Daily deliveries of materials arrive at the dock

B) No shop orders are produced for production

C) Purchased materials are shipped to the point of use

without inspection

D) Material replenishment is driven by consumption

The correct answer is C)

In a ship-to-WIP process, purchased materials are shipped

directly to the point of use without being inspected. This

usually occurs when the vendor has been certified as a

quality vendor whose products will not need inspection.

11-2If a company implements a Just-in-Time project, which

of the following improvements will a customer most

likely receive?

A) Higher quality products

B) Lower freight costs

C) Smaller lot sizes

D) More deliberate design process

The correct answer is A)

Just-in-Time reduces the waste associated with producing

a product. As such, defects created during the manufacture

of a part would be eliminated through root cause analysis.

Freight costs might actually rise if frequent deliveries are

needed. Smaller lot sizes may not occur as a result of

implementing JIT. The design process may need to be

faster and less deliberate although waste in this process

could be eliminated.

11-3Which of the following would be found in a focused

factory?

A) Logical flows of materials through the factory

B) Plant layout by function

C) Increased paperwork to support the operation

D) Increased product variety

The correct answer is A)

A focused factory would generally run a smaller variety of

product down a logical flow in the factory. By focusing the

factory, product can flow down a production line in a

repetitive manner. By restricting the variety of parts being

produced, a flow can be achieved. A wider variety of parts

would make the line much more complicated.

11-4Which of the following physical characteristics are

important for parts containers in a JIT pull system?

I. Sized appropriately for the producing work center

II. Sized appropriately for the consuming work center

III. Designed so they can be moved by hand without

strain

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is C)

The parts containers contribute greatly to the success of

the pull system. They should be sized to feed the

consuming work center with the amount of work calculated

to be the lot size. They should also be designed to move

without material handling equipment.

11-5Suppliers for a manufacturer starting to implement JIT

may be hesitant, at first, to participate because:

A) Their prices may be reduced

B) Schedules may fluctuate without safety stock to

protect them

C) The inventory will be pushed back to them

D) Measurements will be more detailed

The correct answer is C)

Many companies, when they adopt the JIT philosophy,

begin by pushing the inventory back to the suppliers. This

only serves to move the inventory in the pipeline rather

than eliminate the inventory in the pipeline. This does

nothing to help either company because someone must

pay for the inventory which the supplier holds.

12-1Which of the following would best describe the term

poka-yoke?

A) Mistake proofing a process

B) Setups in less than 10 minutes

C) Lot size equal to one

D) Kanban sizing methodology

The correct answer is A)

The term poka-yoke refers to a technique of mistake

proofing a process. For example, having parts assembled

in a certain way so they can only be finished with all the

parts included. A set-up may be poka-yoked in such a

way so the fixture can only go in a certain way without

any manipulation.

12-2The goal of zero defects can be achieved by using

which of the following?

A) Well trained inspectors

B) Statistical sampling

C) Computerized ISO documentation

D) Poka-yoke work methods

The correct answer is D)

Only by mistake proofing the work methods can zero

defects be achieved. Well trained inspectors and statistical

sampling can only catch problems after they have occurred

and good documentation must be followed to be effective.

12-3The concept of deducting component inventory when

finished goods are received into stock is commonly

referred to as:

A) Floor deduction

B) Allocation

C) Material issues

D) Backflushing

The correct answer is D)

Backflushing occurs when the product is received into

finished goods inventory or at a count point in the

operation. The components are deducted from inventory for

the finished goods quantity times the bill of materials for

the product.

12-4Set up time reduction in a JIT implementation is very

important because:

I. Small lot sizes reduce inventory

II. Production output will increase

III. All of the products can be made constantly

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

Set up time reduction provides a great opportunity to

improve operations. Excess set up times use productive

capacity on the machine which could be used for

manufacturing parts, rather than being down for set up.

Reducing set up time also allows small lots to be

produced. The effect of these small lots is to produce only

the amount of product that is demanded by customers.

This reduces the amount of inventory being held.

12-5You are investigating the purchase of new machinery in

a lean manufacturing environment. Which of the

following would be the criteria for selecting the

equipment?

I. Flexible and low cost

II. Quick connect and disconnect capability

III. Single purpose machinery

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is A)

When purchasing machinery to support a lean

manufacturing environment, special attention should be

given to the flexibility of the equipment. The machines

should be easily adaptable to many parts and not just a

single purpose. This will provide flexibilty to the operation.

The machines also should support the quick changeover

needs of a lean manufacturing environment. Features such

as quick connect dies assist in speeding setup.

13-1Long term agreements with suppliers would provide for which of the following?

I. Paperwork elimination II. Cost reductions

III. Joint benefit projects

IV. Special trucking considerations

A) I, II, and III B) I, II, and IV C) II, III, and IV D) I, II, III, and IV

The correct answer is D)

Agreements with suppliers should be kept simple and should spell out the special arrangements of the partnership. Some of the considerations include the containers, trucking, cost reduction projects, and personnel contacts to ease communication. Supplier partnerships must be built on win/win relationships.

13-2

In order to analyze a material flow in a manufacturing process, which of the following tools will be most helpful?

A) Statistical process control chart

B) Fishbone diagram C) Process flow chart D) Force field analysis

The correct answer is C)

A process flow chart is used to analyze any flow of material, process, or information. It allows a person to view a picture of the given process. From this flow chart, action can be taken to improve the flow.

Questions 13-3, 4 refer to the following schedule of a two-operation job.

13-3

It can be concluded from Situation B on the schedule that A) Operation 10 is not a setup operation if operation 20 is a run operation.

B) Total job duration has been increased due to operation

overlap.

C) The percentage of operation overlap is different from that in situation D.

D) It is impossible to overlap operation 10 with operation 20.The correct answer is A)

13-4Based on the schedule, accurate conclusions include which of the following?

I. Increasing the number of shifts has greater impact on overall lead time than overlapping operations.

II. Increasing the number of shifts has less impact on

overall lead time than overlapping operations.

III. The combination of overlapping operations and increasing the number of shifts will result in the shortest overall lead time.

A) I only B) II only C) I and III only D) II and III only

The correct answer is C)

14-1Which of the following are reasons for purchasing outside

capacity?

I. It cuts down on training costs for new employees.

II. It permits increased output with no additional capital

investment.

III. It reduces overtime.

A) I and II only B) I and III only

C) II and III only D) I, II, and III

The correct answer is D)

14-2Which of these tools is most appropriate for contingency

planning?

A) Matrix chart.

B) Process decision program chart.

C) Pareto chart.

D) Continuous improvement chart.

The correct answer is B)

14-3As described in Just-in-Time, manufacturing activities

include which of the following ?

Ⅰ. Design

Ⅱ. Marketing and sales

Ⅲ. Production

Ⅳ. Finance

A) Ⅰ, Ⅲ

B) Ⅰ, Ⅱ, Ⅲ, Ⅳ

C) Ⅰ, Ⅱ, Ⅳ

D) Ⅱ, Ⅲ

The correct answer is B)

14-4There are three jobs to be completed on the schedule

with the following critical ratios associated with the jobs

as follows:

Job 123 0.75

Job 456 0.95

Job 789 1.10

Which job should be processed first?

A) Job 123 B) Job 456

C) Job 789

D) Not enough information to decide

The correct answer is A)

The job with the smallest critical ratio should be worked on

first as it is the furthest behind schedule. While some

extenuating circumstances may force you to run another

job first, the furthest behind would generally have priority.

14-5Which of the following elements of manufacturing

leadtime is generally the longest?

A) Move time

B) Setup time

C) Run time

D) Queue time

The correct answer is D)

Generally, only 10 to 20 percent of manufacturing leadtime

is actual operation time. The rest of the time is caused by

work in process time when the part is not being worked

on. Of this stagnant time, queue time accounts for the

longest time.

15-1A critical ratio of 0.75 means:

A) A job is ahead of schedule by 25%

B) A job is ahead of schedule by 75%

C) A job is behind schedule by 25%

D) A job is behind schedule by 75%

The correct answer is C)

Critical ratio is a measure of whether a job is on schedule

with the value of 1.00 being on schedule. To calculate the

critical ratio, the following formula is used:

Due date - today

--------------------------------

Lead time remaining to complete job

If the time remaining until the due date is less than the

lead time remaining to produce the part, then the job is

behind.

15-2Which of the following are requirements for a shop

order release?

I. Parts availability

II. Order due date

III. Tooling availabiltiy

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

Prior to releasing an order to the shop floor, components

must be available, the required due date should be known,

and the tooling must be available. If these rquirements are

not ready, then the order should not be released. Only

jobs which can be worked on should be released to the

floor.

15-3All of the following affect the queue time of a job at a

work center. However, which one of the following is the

most important factor affecting the queue time?

A) The existing queue time at the work center

B) The set up times on the various jobs

C) The lot size of the job

D) The priority of the job

The correct answer is D)

The priority of the job is the most important factor affecting

the queue time at a work center. The queue time will be

eliminated if the priority of the job is high enough to

bypass all the other jobs waiting for the work center (e.g.

President says to make the job next).

15-4Given the following information for a work center:

Machines = 2

Operations per shift = 3

Shifts per day = 1

Days worked per week = 4

Hours worked per shift = 10

Machine utilization = 90%

Operator efficiency = 80%

The weekly available capacity at the above work center

is (rounded to the nearest whole standard hour):

A) 50

B) 55

C) 58

D) 60

The correct answer is C)

Available capacity is calculated: 2 machines x 1 shift x 4

days x 10 hours x .90 utilization x .80 operator efficiency =

57.6.

16-1The process of finishing product A at work center 101

has just been completed. In order to prepare for

running product B at this workstation, different tooling

must be installed. This process is called:

A) Interoperation time

B) Changeover

C) Tooling reconfiguration

D) Queue time

The correct answer is B)

A changeover is the process of re-fitting equipment to

offset the effects of the previous production and/or get the

work center ready for the next production.

16-2A bottleneck operation can be best defined as:

A) An operation where work arrives faster than can be

completed

B) The place where emergency maintenance is often

needed

C) The work center which begins the production

process

D) The gateway work center for counting

The correct answer is A)

The work center where work arrives faster than can be

completed is the bottleneck. By concentrating on

alleviating the bottleneck, capacity can often be increased,

as all downstream operations can only complete work

released at the bottleneck rate.

16-3Which of the following would best describe the term

dedicated capacity?

I. A machine which is designated to produce only one

item

II. Special equipment designed specifically to produce a

small group of items

III. The 20% committed capacity a customer has taken

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is A)

Dedicated capacity refers to the way work centers have

been assigned to manufacture specialized products.

16-4Which of the following could be causes of idle time?

I. Maintenance

II. Set-up

III. Training

A) I and II

B) I and III

C) II and III

D) I, II, and III

The correct answer is D)

Idle time or down-time results when machines or operators

are not producing product for a number of reasons

including training, set-up, and maintenance.

16-5Which of the following statements are true regarding

Just-in-Time production?

I. Only refers to the delivery of products when needed

II. Refers to the elimination of waste - "If it doesn't

add value, it's waste; eliminate it"

III. It is a pull system

A) I and II B) I and III

C) II and III D) I, II and III

The correct answer is C)

Many people believe it is only a "delivery of material as

needed" system. It is a philosophy of waste elimination

and worker involvement. Additionally, work is pulled

through the factory based on demand.

17-1Based on the following labor hours information,

calculate the labor efficiency for the week based on an

8 hour shift (times are expressed in hours).

Day 1 Day 2 Day 3 Day 4 Day 5

Set up time . .75 1.0 1.0 1.25 1.50

Run time 6.25 5.5 5.5 5.50 6.25

Wait time . 1.00 1.5 l.5 1.25 .25

A) 72.5% B) 86.25%

C) 91.25% D) 95.00%

The correct answer is B)

Labor efficiency is calculated by dividing the direct time

charged to production activities (set up hours & run time

hours) by the clock time available for the activities or

34.5/40 = 86.25%.

17-2If the manufacturing calendar in the manufacturing

system defines weekends as non-work days, then a 35

day lead time is equal to:

A) 5 weeks

B) 6 weeks

C) 7 weeks

D) 9 weeks

The correct answer is C)

Establishing the manufacturing calendar by defining

weekends as non-work days would cause a 35 day

leadtime to be 7 weeks.

17-3Which of the following is true regarding an open order?

I. It is a released manufacturing order

II. It is a scheduled receipt

III. It is an unfilled customer order

A) I and II

B) I and III

C) II and III

D) I, II, and III

The correct answer is D)

An open order can mean any of the above answers,

depending on what module of an MRPII system you are

in. In an order entry module, customer orders could be in

an open state. In terms of manufacturing, an open order

would be a scheduled receipt or a released manufacturing

order.

17-4Which of the following methods is the fastest method

for adding capacity?

A) Hire new people

B) Add another shift

C) Schedule overtime

D) Subcontract work

The correct answer is C)

Scheduling overtime is quicker than any of the options

listed, including subcontracting, which could require sourcing

a contractor. However, overtime is only an option if there

is capacity available.

17-5If the input to a work center is equal to the output

from the work center, then which of the following is

true?

I. Backlogs are constant

II. Lead-time remains constant

III. Lead-time will increase slightly

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is A)

If input equals output, then lead-time and backlogs will

remain constant.

18-1A "healthy" work-in-process inventory can be generally

defined by which of the following statements?

I. Three days

II. Twenty five percent of finished goods

III. The minimum amount needed to smooth

fluctuations in input

A) I B) II

C) III D) I or III

The correct answer is C)

Work-in-process is intended to allow work centers to

operate even with fluctuations in input to the work center.

18-2Which of the following is/are needed in order to

calculate manufacturing lead-times?

I. Routings

II. Interoperation times

III. Component purchase lead time

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is A)

Component purchase lead-time is not included in the

manufacturing lead-time. Manufacturing lead-time would

include order preparation time, queue time, set-up time,

run time, etc.

18-3Given the following information for a work center:

Machines = 3

Operations per shift = 2

Shifts per day = 1

Days worked per week = 5

Hours worked per shift = 8

Machine utilization = 80%

Operator efficiency = 90%

If changing the hours per shift to 10 from 8 creates

108 standard hours, which of the following actions

would have the same effect?

A) Increase machine utilization to 90%

B) Increase operator efficiency to 100%

C) Change to 6 days per week

D) None of the above

The correct answer is D)

None of the answers give the available capacity of 108

which changing to a 10 hour shift does. This is calculated

by multiplying 3 machines x 50 hours x .80 machine

utilization x .90 operator efficiency. Answer A = 97.2

hours, Answer B = 96 hours, Answer C = 103.7 hours.

18-4Which of the following best describes back scheduling?

A) Start with the current date and calculate the order

due date by the time of each operation

B) Rescheduling jobs where the input is greater than

output

C) Starting with the order due date, calculate the start

date of the order by going back through each

operation

D) Eliminating capacity availability by working back

through the operations

The correct answer is C)

Backward scheduling starts with the order due date and

schedules back through each operations' due date to arrive

at a start date for the order.

19-1Product A can be produced at the rate of 60 per hour

or one each minute. This time is known as the:

A) Standard rate

B) Cycle time

C) Capacity rate

D) Setup time

The correct answer is B)

The cycle time is the time between the completion of two

units of production.

19-2Which of the following is synonomous with detailed

scheduling?

A) Infinite loading

B) Operations scheduling

C) GANTT charts

D) Pert charts

The correct answer is B)

Detailed operation scheduling places start and completion

dates on each manufacturing operation to ensure the

customer due date will be met.

19-3Job ABC will take 100 standard hours to produce.

Using the following information, how many equivalent

days will it take to complete the job (round to the

nearest whole day)?

Machines = 2

Number of operations = 2

Shifts per day = 1

Hours per shift = 8

Machine utilization = 90%

Operator efficiency = 90%

A) 6

B) 7

C) 8

D) 9

The correct answer is C)

There are 12.96 available hours per day (2 machines x 8

hours per day x .90 utilization x .90 efficiency). 100

hours needed/12.96 hours available = 7.72 or 8 days.

19-4Which of the following best describes a focused

factory?

A) A plant where all personnel understand the mission

and objectives

B) A plant which is established to produce a limited

mix of items

C) A plant which has embraced a zero-defect program

D) A plant which concentrates on one job at a time

The correct answer is B)

A focused factory has been set up to run a limited

number of processes or products to allow for an efficient

flow of materials. This can be focused within a larger

physical factory.

20-1Four-wall inventory control with JIT would most likely

include which of the following practices ?

A) Increased dependence on cycle counting for

inventory record securacy

B) ABC analysis on a frequent basis

C) Increased volume of transactions in and out of

inventory

D) Backflushing to reflect material usage

The correct answer is D)

20-2The most likely reason for both marketing and

operation to resist implementing JIT practices is

A) Reduced finished goods inventory levels

B) Emphasis on production efficiencies

C) Shorter manufacturing lead time

D) The change to the relationship between marketing

and operation

The correct answer is D)

20-3Which of the following are true regarding a limiting

operation?

I. It is the operation with least capacity

II. It defines the capacity of the line

III. It is the bottleneck

A) I and II B) I and III

C) II and III D) I, II, and III

The correct answer is D)

A limiting operation is synonomous with bottleneck, as it is

the operation with least capacity. This allows the line to

be scheduled by this operation as the line capacity can

only be as great as the operation with least capacity.

20-4A supplier is responsible to provide 100% acceptable

quality to the customer. This is called:

A) Total quality management

B) Statistical process control

C) Quality at the source

D) Total quality control

The correct answer is C)

Quality at the source requires 100% acceptable quality to

be delivered to the customer. This may be an element of

total quality management or the vendor may use statistical

process control to achieve the result; however quality at

the source defines this example.

20-5The total time included in an operation's duration

includes all of the following EXCEPT:

A) Set-up time

B) Wait time after completion

C) Run time of operation

D) Tooling

The correct answer is B)

Wait time after completing a job would not be included in

the operation's duration.

ACFUN正式会员答题题库(全答案)

1、关于意见反馈,一下说法不正确的是?A A、意见反馈需要登录才能反馈B.用户可以直接咨询客服 C.存在反馈快捷通道 D.意见反馈和举报效果一样 2、一下四个著名的动画业界人士,没有在动画业界童话《白箱》里出现过的是A A. 富野由悠季 B.庵野秀明 C.南雅彦 D.石川光久 3、《南方公园》中拥有无限复活能力的角色是?D A.斯坦 B.凯尔 C.卡特曼 D.肯尼 4、游戏《无主之地》系列中,帅哥杰克的面具下隐藏着?B A.外星人脸 B.秘藏标识 C.一模一样的脸 D.魔女的标识 5、评论才是本体?C A.下体 B.三体 C.本体 D.扁桃体 6、韩国男子组合bigbang的MV…love song?,采用了一连贯的长镜头组成,但有一个破 绽可以看出是MV后期合成的,这个破绽是? A.崔胜贤的项链 B.姜大成的西装 C.权志龙的手表 D.东永斐的皮鞋 7、北斗之萨样指的是哪位日本声优?A A后藤邑子 B.后藤纱里绪 C.佐藤利奈 D.新井里美 8.一下哪位男性没有喜欢过吉安娜?普罗德摩尔?B A.阿尔萨斯 B.伊利丹 C.凯尔萨斯 D.萨尔 9、“葛炮”的原型人物,曾为哪部动画配音?C A.喜洋洋与灰太狼 B.熊出没 C.蓝猫淘气三千问 D.西游记 10、织田信长的绰号为?C A.第四天魔王 B.第五天魔王 C.第六天魔王 D.第七天魔王 11、A战的“阿婆主”指的是?C A.下载视频的人 B.观众 C.投稿的人 D.管理员 12.一下作品不属于漫画家岩明均所著的是D ? A.七夕之国 B.历史之眼 C.寄生兽 D.无限之住人 13.导演水岛精二最近的一部剧场版动画名字是D ? A.裸之催眠术师 B.EXODUS C.第三飞行少女队 D.乐园追放 14、一下LOL里没有中国元素的英雄是?B A.齐天大圣 B.无极剑圣 B.盲僧D.德邦总管 15、2015年“这本小说真厉害”第一名的小说中,黑长直女主角头发上扎了几个蝴蝶结?

高频电子线路试题及答案 (1)

一、填空题 1. 丙类功放按晶体管集电极电流脉冲形状可分为__欠压、__临界__、__过压__ 三种工作状态,它一般工作在___临界____ 状态。 2. 振荡器的主要性能指标_频率稳定度_、_振幅稳定度_。 3. 放大器内部噪声的主要来源是__电阻__和__晶体管__。 4. 某发射机输出级在负载RL=1000Ω上的输出信号Us(t)=4(1+0.5cosΩt)COSWctV。试问Ma=__0.5__,Ucm=__4V__,输出总功 率Pav=__0.009W_ 。 5. 实现频率调制就是使载波频率与调制信号呈线性规律变化,实现这个功能的方法很多,通常可分为__直接调频__和__间接调频___ 两大类。 6. 相位鉴频器是先将调频信号变换成__调相-调频__信号,然后用___相位检波器___进行解调得到原调制信号。 二、选择题 1. 频率在1.5—30MHz范围的短波主要依靠(C )方式传播。 A 沿地面传播 B 沿空间直线传播 C 依靠电离层传播 2. 在实际振荡器中,有时会出现不连续的振荡波形,这说明振荡器产生了周期性的起振和停振现象,这种现象称为(B )。 A 频率占据 B 间歇振荡 C 寄生振荡 4. 集成模拟相乘器是(B )集成器件。 A 线性 B 非线性 C 功率 5. 自动增益控制电路是(A )。 A AGC B AF C C APC 三、分析题(共4题,共45分) 1. 通信系统中为什么要采用调制技术。(8分) 答:调制就是用待传输的基带信号去改变高频载波信号某一参数的过程。 采用调制技术可使低频基带信号装载到高频载波信号上,从而缩短天线尺寸,易于天线辐射,实现远距离传输;其次,采用调制可以进行频分多路通信,实现信道的复用,提高信道利用率。 2.晶体振荡电路如图1所示,若f1为L1C1的谐振频率,f2为L2C2的谐振频率,试分析电路能否产生自激振荡。若能振荡,指 出振荡频率与f!、f2之间的关系。(12分) +V CC 答:由图可见电路可构成并联型晶体振荡器。由于并联型晶体振荡器中,石英晶体起电感元件作用,所以要产生自激振荡,L1C1并联回路与L2C2串联回路都必须呈容性,所以,WL1 > 1/WC1即f > f1,WL2 < 1/WC2即f < f2,振荡频率f与f1、f2之

acfun题库310道题(2015.6)

1、关于意见反馈,一下说法不正确的是?D A、意见反馈需要登录才能反馈 B.用户可以直接咨询客服 C.存在反馈快捷通道 D.意见反馈和举报效果一样 2、一下四个著名的动画业界人士,没有在动画业界童话《白箱》里出现过的是A A. 富野由悠季 B.庵野秀明 C.南雅彦 D.石川光久 3、《南方公园》中拥有无限复活能力的角色是?D A.斯坦 B.凯尔 C.卡特曼 D.肯尼 4、游戏《无主之地》系列中,帅哥杰克的面具下隐藏着?B A.外星人脸 B.秘藏标识 C.一模一样的脸 D.魔女的标识 5、评论才是本体?C A.下体 B.三体 C.本体 D.扁桃体 6、韩国男子组合bigbang的MV‘love song’,采用了一连贯的长镜头组成,但有一个破绽可以看出是MV后期合成的,这个破绽是?C A.崔胜贤的项链 B.姜大成的西装 C.权志龙的手表 D.东永斐的皮鞋 7、北斗之萨样指的是哪位日本声优?A A后藤邑子 B.后藤纱里绪 C.佐藤利奈 D.新井里美 8.一下哪位男性没有喜欢过吉安娜?普罗德摩尔?B A.阿尔萨斯 B.伊利丹 C.凯尔萨斯 D.萨尔 9、“葛炮”的原型人物,曾为哪部动画配音?C A.喜洋洋与灰太狼 B.熊出没 C.蓝猫淘气三千问 D.西游记 10、织田信长的绰号为?C A.第四天魔王 B.第五天魔王 C.第六天魔王 D.第七天魔王 11、A战的“阿婆主”指的是?C A.下载视频的人 B.观众 C.投稿的人 D.管理员 12.一下作品不属于漫画家岩明均所著的是 D ? A.七夕之国 B.历史之眼 C.寄生兽 D.无限之住人 13.导演水岛精二最近的一部剧场版动画名字是D ? A.裸之催眠术师 B.EXODUS C.第三飞行少女队 D.乐园追放 14、一下LOL里没有中国元素的英雄是?B A.齐天大圣 B.无极剑圣 B.盲僧 D.德邦总管 15、2015年“这本小说真厉害”第一名的小说中,黑长直女主角头发上扎了几个蝴蝶结?C

汽车发动机原理试题库及答案

一、发动机的性能 一、解释术语 1、指示热效率:是发动机实际循环指示功与消耗燃料的热量的比值. 2、压缩比:气功容积与燃烧室容积之比 3、燃油消耗率:发动机每发出1KW有效功率,在1h内所消耗的燃油质量 4、平均有效压力:单位气缸工作容积所做的有效功 5、有效燃料消耗率:是发动机发出单位有效功率时的耗油量 6、升功率:在标定工况下,发动机每升气缸工作容积说发出的有效功率 7、有效扭矩:曲轴的输出转矩 8、平均指示压力:单位气缸容积所做的指示功 2、示功图:发动机实际循环常用气缸内工质压力P随气缸容积V(或曲轴转角)而变化的曲线 二、选择题 1、通常认为,汽油机的理论循环为( A ) A、定容加热循环 B、等压加热循环

C、混合加热循环 D、多变加热循环 6、实际发动机的膨胀过程是一个多变过程。在膨胀过程中,工质( B ) A、不吸热不放热 B、先吸热后放热 C、先放热后吸热 D、又吸热又放热 2、发动机的整机性能用有效指标表示,因为有效指标以( D ) A、燃料放出的热量为基础 B、气体膨胀的功为基础 C、活塞输出的功率为基础 D、曲轴输出的功率为基础 5、通常认为,高速柴油机的理论循环为( C ) A、定容加热循环 B、定压加热循环 C、混合加热循环 D、多变加热循环 6、实际发动机的压缩过程是一个多变过程。在压缩过程中,工质( B ) A、不吸热不放热 B、先吸热后放热 C、先放热后吸热 D、又吸热又放热

2、发动机工作循环的完善程度用指示指标表示,因为指示指标以( C ) A、燃料具有的热量为基础 B、燃料放出的热量为基础 C、气体对活塞的做功为基础 D、曲轴输出的功率为基础 2、表示循环热效率的参数有( C )。 A、有效热效率 B、混合热效率 C、指示热效率 D、实际热效率 3、发动机理论循环的假定中,假设燃烧是( B )。 A、定容过程 B、加热过程 C、定压过程 D、绝热过程 4、实际发动机的压缩过程是一个( D )。 A、绝热过程 B、吸热过程 C、放热过程 D、多变过程 5、通常认为,高速柴油机的理论循环为( C )加热循环。 A、定容 B、定压 C、混合 D、多变

高频电子线路试题库

(填空题 1435) 提高振荡器频率稳定度的方法有提高振荡回路的标准性, 减小晶体管的影响, _______ , 减少电源与负载的影响等. (填空题 2268) DSB 信号必须用________电路进行解调. (填空题 3913) 同步检波电路通常有____ 与 ____ 两种类型. (填空题 0857) 二极管峰值包络检波电路只能用于______信号的检波. (填空题 3471) 本振信号的注入要主意 ____ , ____ 两个问题. (填空题 3954) 直接调频有 ____ , ____ 等主要形式. (填空题 4237) 间接调频有 ____ , ____ , ____ 等主要形式. (填空题 6683) LC并联回路谐振时,回路的最大,且为纯 . (填空题 4849) 已知LC并联谐振回路的品质因数为 Q, 且 Q>>1,谐振频率为 f0。 则其通频带等于; (填空题 7226) 对于自动频率控制和自动相位控制电路,被控对象为 .对于频率和相位固定的输入信号,锁相环路的稳态相位差所产生的控制角频差应等于 (填空题 5314) 消除高频谐振放大器不稳定性的常用方法有__, 及__. (填空题 4293) 在集电极调幅电路中, 晶体管应工作于状态. (填空题 6585) 常用的鉴频方法有 ____, ____ , ____ . (填空题 8898) 集电极调幅电路的线性__, 所需调制功率__. (填空题 7474) 基极调幅电路的线性__, 所需调制功率__. (填空题 1193) 获得 SSB 信号的常用方法有__, __. (填空题 5984) 获得调频信号的常用方法有__, __. (填空题 9921) 相位鉴频器线性较__, 对寄生调幅__抑制能力. (填空题 8827) 比例鉴频器线性较__, 对寄生调幅__抑制能力. (填空题 5746) 下图所示振荡电路的的振荡频率为__, 振荡器的类型为__. (填空题 2182) 通常将频率在 ____ 到 ____ 之间的无线电频段称为长波. (填空题 1892) 通常将频率在 ____ 到 ____ 之间的无线电频段称为中波. (填空题 1953) 通常将频率在 ____ 到 ____ 之间的无线电频段称为短波. (填空题 1997) 通常将频率在 ____ 到 ____ 之间的无线电频段称为超短波. (填空题 2473) 通常将频率在30~300kHz范围内的无线电频段称为____. (填空题 0164) 通常将频率在~3MHz范围内的无线电频段称为____. (填空题 4773) 通常将频率在3~30MHz范围内的无线电频段称为____. (填空题 3415) 通常将频率在30~300MHz范围内的无线电频段称为____. (填空题 5294) 实测某电感线圈在f = 10MHz 时的 L =100 H, Q0 = 100, 则该线圈的等效并联电阻为____. (填空题1684) LC 并联谐振回路适用于内阻较____的信号源, 而串联谐振回路适用于内阻较____的信号源. (填空题 5542) 已知某放大器的噪声系数N F = , 用等效噪声温度表示约为____. (填空题 9078) 已知某放大器的等效噪声温度 T = 75K, 用分贝表示约为____. (填空题 4626) 已知某放大器的等效噪声温度 T = 35K, 用分贝表示约为____. (填空题 8282) 已知某FM信号的表达式如下: v FM(t)=(8cos(8π×107t+15cos(4π×103t)))V, 则其载频f c = ____,调制信号频率F =____,频偏Δf m =___,调频指数m f =____, 信号带宽 BW =____. (填空题 2701) 已知某PM信号的表达式如下: v FM(t)=(5cos(2π×107t+25cos(6π×103t)))V, 则其载频f c = ____,调制信号频率F =____,频偏Δf m =___,调频指数m f =____, 信号带宽 BW =____. (填空题 3058) 下图所示电路的名称是 ____ . 其优点是____, 缺点是 ____. (填空题 2363) 下图所示电路的名称是____ . 其优点是____, 缺点是 ____. (填空题 5045)某超外差式接收机的中频f I=, 本振频率 f L

高频电子线路试题4含答案

四川信息职业技术学院 《高频电子线路》模拟考试试卷四 班级姓名学号 一、填空题(每空1分,共14分) 1.放大电路直流通路和交流通路画法的要点是:画直流通路时,把视为开路; 画交流通路时,把视为短路。 2.晶体管正弦波振荡器产生自激振荡的相位条件是,振幅条件是。 3.调幅的就是用信号去控制,使载波的 随大小变化而变化。 4.小信号谐振放大器的主要特点是以作为放大器的交流负载,具有和功能。 5.谐振功率放大器的调制特性是指保持及不变的情况下,放大器的性能随变化,或随变化的特性。 二、选择题(每小题2分、共30分)将一个正确选项前的字 母填在括号内 1.二极管峰值包络检波器适用于哪种调幅波的解调()A.单边带调幅波 B.抑制载波双边带调幅波 C.普通调幅波 D.残留边带调幅波 2.欲提高功率放大器的效率,应使放大器的工作状态为()A.甲类 B.乙类 C.甲乙类 D.丙类 3.为提高振荡频率的稳定度,高频正弦波振荡器一般选用()A.LC正弦波振荡器 B.晶体振荡器 C.RC正弦波振荡器

4.变容二极管调频器实现线性调频的条件是变容二极管的结电容变化指数γ为() A.1/3 B.1/2 C.2 D.4 5.若载波u C(t)=U C cosωC t,调制信号uΩ(t)= UΩcosΩt,则调相波的表达式为()A.u PM(t)=U C cos(ωC t+m f sinΩt) B.u PM(t)=U C cos(ωC t+m p cosΩt) C.u PM(t)=U C(1+m p cosΩt)cosωC t D.u PM(t)=kUΩU C cosωC tcosΩt 6.某超外差接收机的中频为465kHz,当接收550kHz的信号时,还收到1480kHz 的干扰信号,此干扰为() A.干扰哨声 B.中频干扰 C.镜像干扰 D.交调干扰 7.某调频波,其调制信号频率F=1kHz,载波频率为10.7MHz,最大频偏Δf m =10kHz,若调制信号的振幅不变,频率加倍,则此时调频波的频带宽度为 ()A.12kHz B.24kHz C.20kHz D.40kHz 8.MC1596集成模拟乘法器不可以用作()A.混频 B.振幅调制 C.调幅波的解调 D.频率调制 9.某单频调制的普通调幅波的最大振幅为10v,最小振幅为6v,则调幅系数m a为() A.0.6 B.0.4 C.0.25 D.0.1 10.以下几种混频器电路中,输出信号频谱最纯净的是() A.二极管混频器 B.三极管混频器 C.模拟乘法器混频器 11.某丙类谐振功率放大器工作在临界状态,若保持其它参数不变,将集电极直流电源电压增大,则放大器的工作状态将变为() A.过压 B.弱过压 C.临界 D.欠压 12.鉴频的描述是() A.调幅信号的解调 B.调频信号的解调 C.调相信号的解调 13.利用石英晶体的电抗频率特性构成的振荡器是()A.f=fs时,石英晶体呈感性,可构成串联型晶体振荡器 B.f=fs时,石英晶体呈阻性,可构成串联型晶体振荡器 C.fs

发动机试题及答案 全套

一.选择题(每个2分) 1.发动机排量就是指发动机各气缸( A )的总与。 A.工作容积 B.燃烧室容积 C.总容积 D.浮子室容积 2.在冷却系中,( A )的作用就是控制流经散热器的水量的元件。 A、节温器 B、水泵 C、旁通阀 D、储水 罐 3、发动机的气缸壁采用( C )。 A、润滑脂润滑 B.压力润滑 C.飞溅润滑 D.其它润滑 4、凸轮轴上凸轮的轮廓的形状决定于( B )。 A、气门的升程 B.气门的运动规律 C.气门的密封状况 D.气门的磨损规律 5、汽油的辛烷值表示汽油的( C )。 A.经济性 B.挥发性 C.抗爆性 D.燃烧性 6、发动机的压缩比就是指( A )之比。 A.气缸总容积与燃烧室容积 B.气缸工作容积与燃烧室容积 C.发动机排量与燃烧室容积 D.气缸总容积与气缸工作容积 7、采用可变配气相位的目的就是( A ) A、提高充气效率 B.提高进气时间 C.减少污染 D.便于排气 8、四冲程V型六缸发动机的发火间隔角为(C )

A.60 B.90 C.120 D.180 9、进气门晚关的目的就是( A )。 A、充分利用气流的惯性,增加进气量 B.减少进气阻力 C.排气更容易 D.减少进气量 10、某四冲程6缸发动机工作时,凸轮轴旋转60转,该发动机第6 缸完成工作循环次数为( D ) A.30次 B.40次 C.50次 D.60次 11、进、排气门在排气上止点时( D) A、进气门开,排气门关 B、排气门开,进气门关 C、进、排气门全关 D、进、排气门叠开 12、、发动机中,活塞与连杆之间的活塞销主要起(C) A定位作用B过载保护作用C联接作用D防松作用 13、车用汽油发动机在大负荷与全负荷稳定工况时,对可燃混合气 过量空气系数a的要求就是(B) A、a=0、45~0、55 B 、a=0、85~0、95 C、a=1、05~1、15 D 、a=1、35~1、45 二.名词解释(每个3分) .1、空燃比 可燃混合气中空气质量与燃油质量之比为空燃比 2、气缸的工作容积

高频电子线路题库(附答案)1分解

一、填空题 1、_信源_____就是信息的来源。 2、电信系统中规定的语音信号频率范围是从_300_____Hz 到__3.4K____Hz 。 3、___信道___是连接发送、接收两端的信息的通道,也称为传输媒质。 4、通信系统中应用的信道分为__有线____信道和无线信道两种。 5、常用的有线信道传输媒质有_架空明线_____、__光缆____和__同轴电缆____。 6、无线电波传播的方式有___沿地面________传播,也称___中长波___波;__沿空间__传播也称___超短波___波;____电离层________传播,称为__短波____波。 7、为了有效地发射和接收电磁波,天线的尺寸必须与电磁波的_波长_____相比拟。 8、现代通信系统中一般不采用将信号直接传输的工作方式,而是要对信号进行__调制____后再送入信道传输。 9、小信号选频放大器的矩形系数越___接近1___越好。 10、小信号谐振放大器应当设法__减小____负载和信号源内阻对谐振回路的影响。 11、小信号谐振放大器中的变压器采用抽头接入,是为了减少__负载____和_____信号源内阻_______对谐振回路的影响。 12、采用___共射-共基_____电路是解决小信号谐振放大器稳定性问题的有效方法。 13、_声表面波_____滤波器的优点有:体积小、工作稳定、无需调试等。 14、常用的固体(态)滤波器有:___声表面_________、____陶瓷________和_____石英_______。 15、常用晶体管的高频等效电路有___Y 参数___等效电路和__混合π参数____等效电路。 16、影响晶体管高频性能的主要因素是它的内部存在__结电容____。 17、晶体管的一个重要高频参数是它的___特征___频率T f ,它是晶体管的β下降为__1____时的工作频率。晶体管的结电容越___小___,其T f 参数越大。 18、LC 串联谐振回路谐振发生时,呈现___很小___的阻抗;电容上的谐振电压___大___于输入电压,是输入电压的Q 倍。因此串联谐振也叫电__压____谐振。 19、LC 并联谐振回路谐振发生时,呈现__很大____的阻抗;流过电容的谐振电流___大于___于输入电流,是输入电流的Q 倍。因此并联谐振也叫电___流___谐振。 20、LC 谐振回路的Q 值与电感器的寄生电阻r 大小有关,r 越小Q 值越__大____。 21、LC 谐振回路的通频带计算公式为___ 7.0BW =_f0/Q________。 22、单LC 谐振回路的矩形系数≈=7 .01.01.0BW BW K ___10____。

发动机经典试题库与答案

一、单选题 1、活塞最大的磨损部位一般是( D )。 A﹑头部B﹑裙部 C﹑顶部 D﹑环槽部 2、缸体平面度误差较大,应采取( D ) A﹑互研法修理B﹑刮削法修理 C﹑锉削法修理 D﹑磨削法修理 3、活塞一个冲程所扫过的容积称为( C )。 A﹑燃烧室容积 B﹑气缸总容积 C﹑气缸工作容积 4、下列发动机不是新型发动机的是( C )。 A﹑电控柴油机B﹑双燃料汽车发动机C﹑使用乙醇作为燃料的发动机 5、气缸内的气体在( B )时,温度和压力达到最大。 A﹑压缩冲程B﹑作功冲程 C﹑排气冲程 6、汽车发动机的标定功率是指(A) A、15min功率 B、1h功率 C、12h功率 D、持续功率 7、外径千分尺能准确读出( C ) A.0.001mm B.0.01cm C.0.01mm D.0.1mm

8、汽车发动机目前采用的活塞材料是( D ) A.铸铁 B.钢 C.铝 D.铝合金 9、能显示扭转力矩的是( C )。 A.套筒扳手 B.梅花扳手 C.扭力扳手 10、柴油机是采用( A )方式点火的。 A.压燃 B.电火花 C.其他 11、汽油机点火时间越早,发生爆燃的可能将 ( A )。 A.越大 B.越小 C.不变 D.与点火时间无关 12、汽油机排气冒黑烟的主要原因之一是 ( B )。 A.喷油时间过迟 B.喷油时间过早 C.喷油量过小 D.速燃期过短 13、发动机进气过程结束时,汽缸内压力总是(D) A、大于大气压力 B、等于大气压力 C、与大气压力无关 D、小于大气压力

14、活塞与气缸壁之间的润滑方式是( B )。 A.压力润滑 B.飞溅润滑 C.脂润滑 D.压力润滑和飞溅润滑同时进行 15、正常工作的发动机,其机油泵的限压阀应该是(A )。 A.经常处于关闭状态 B.热机时开,冷机时关 C.经常处于溢流状态 D.热机时关,冷机时开 16、机油压力表是用来检测发动机( A )的工作情况。 A、润滑系; B、冷却系 C、传动系 17、发动机冷却系中节温器损坏,将会导致发动机( C )。 A、燃料消耗变少 B、燃料消耗变多; C、温度过低或过高。 18、排气管“放炮”的主要原因有:( A )。 A、混合气过浓; B、点火时间过早; C、发动机过冷; 19、在行驶过程中,发动机突然过热,原因可能是( A )。 A、冷却系严重缺水 B、无节温器 C、节温器打开 20、下列不属于配气机构的是( A ) A、曲轴 B、气门 C、气门弹簧 D、气门油封

(完整版)高频电子线路试题库

高频电子线路试题库 一、单项选择题(每题2分,共20分) 第二章选频网络 1、LC串联电路处于谐振时,阻抗( B )。 A、最大 B、最小 C、不确定 2、LC并联谐振电路中,当工作频率大于、小于、等于谐振频率时,阻抗分别呈( B )。 A、感性容性阻性 B、容性感性阻性 C、阻性感性容性 D、感性阻性容性 3、在LC并联电路两端并联上电阻,下列说法错误的是( D ) A、改变了电路的谐振频率 B、改变了回路的品质因数 C、改变了通频带的大小 D、没有任何改变 第三章高频小信号放大器 1、在电路参数相同的情况下,双调谐回路放大器的通频带与单调谐回路放大器的通频带相比较A A、增大?B减小?C 相同? D无法比较 2、三级相同的放大器级联,总增益为60dB,则每级的放大倍数为( D )。 A、10dB B、20 C、20 dB D、10 3、高频小信号谐振放大器不稳定的主要原因是(C ) (A)增益太大(B)通频带太宽(C)晶体管集电结电容C b’c的反馈作用(D)谐振曲线太尖锐。第四章非线性电路、时变参量电路和混频器 1、通常超外差收音机的中频为( A ) (A)465KH Z (B)75KH Z (C)1605KH Z (D)10.7MH Z 2、接收机接收频率为f c,f L>f c,f I为中频频率,则镜象干扰频率为( C ) (A)f c>f I (B)f L+f c (C)f c+2f I(D)f c+f I 3、设混频器的f L >f C,即f L =f C+f I ,若有干扰信号f n=f L+f I,则可能产生的干扰称为( D )。 (A)交调干扰(B)互调干扰(C)中频干扰(D)镜像干扰 4、乘法器的作用很多,下列中不属于其作用的是( D ) A、调幅 B、检波 C、变频 D、调频 5、混频时取出中频信号的滤波器应采用( A ) (A)带通滤波器(B)低通滤波器(C)高通滤波器(D)带阻滤波器 6、频谱线性搬移电路的关键部件是( B ) (A)相加器(B)乘法器(C)倍频器(D)减法器 7、在低电平调幅、小信号检波和混频中,非线性器件的较好特性是( C ) A、i=b0+b1u+b2u2+b3u3 B、i=b0+b1u+b3u3 C、i=b2u2 D、i=b3u3 8、我国调频收音机的中频为( D ) (A)465KH Z (B)455KH Z (C)75KH Z (D)10.7MH Z 9、在混频器的干扰中,组合副波道干扰是由于----------- 造成的。(A ) (A)有用信号与本振信号的组合(B)有用信号与干扰信号同时作用 (C)两个或多个干扰信号同时作用(D)外来干扰信号与本振信号的组合 第五章高频功率放大器 1、常用集电极电流流通角?的大小来划分功放的工作类别,丙类功放( D )。(说明:?为半导通角) (A)? = 180O (B)90O???180O (C)? =90 O (D)??90O 2、谐振功率放大器与调谐放大器的区别是( C ) A、前者比后者电源电压高 B、前者比后者失真小 C、谐振功率放大器工作在丙类,调谐放大器工作在甲类 D、谐振功率放大器输入信号小,调谐放大器输入信号大 3、已知某高频功率放大器原工作在临界状态,当改变电源电压时,管子发热严重,说明功放管进入了A

汽车发动机原理试题库及答案

一、发动机的性能 二、选择题 1、通常认为,汽油机的理论循环为( A ) A、定容加热循环 B、等压加热循环 C、混合加热循环 D、多变加热循环 6、实际发动机的膨胀过程是一个多变过程。在膨胀过程中,工质( B ) A、不吸热不放热 B、先吸热后放热 C、先放热后吸热 D、又吸热又放热 2、发动机的整机性能用有效指标表示,因为有效指标以( D ) A、燃料放出的热量为基础 B、气体膨胀的功为基础 C、活塞输出的功率为基础 D、曲轴输出的功率为基础 5、通常认为,高速柴油机的理论循环为( C ) A、定容加热循环 B、定压加热循环 C、混合加热循环 D、多变加热循环 6、实际发动机的压缩过程是一个多变过程。在压缩过程中,工质( B ) A、不吸热不放热 B、先吸热后放热 C、先放热后吸热 D、又吸热又放热 2、发动机工作循环的完善程度用指示指标表示,因为指示指标以( C ) A、燃料具有的热量为基础 B、燃料放出的热量为基础 C、气体对活塞的做功为基础 D、曲轴输出的功率为基础 2、表示循环热效率的参数有( C )。 A、有效热效率 B、混合热效率 C、指示热效率 D、实际热效率 3、发动机理论循环的假定中,假设燃烧是( B )。 A、定容过程 B、加热过程 C、定压过程 D、绝热过程 4、实际发动机的压缩过程是一个( D )。 A、绝热过程 B、吸热过程

C、放热过程 D、多变过程 5、通常认为,高速柴油机的理论循环为( C )加热循环。 A、定容 B、定压 C、混合 D、多变 6、实际发动机的膨胀过程是一个( D )。 A、绝热过程 B、吸热过程 C、放热过程 D、多变过程 7、通常认为,低速柴油机的理论循环为( B )加热循环。 A、定容 B、定压 C、混合 D、多变 8、汽油机实际循环与下列(B )理论循环相似。 A、混合加热循环 B、定容加热循环 C、定压加热循环 D、卡诺循环 9、汽油机常用的压缩比在( B )范围内。 A、4 ~7 B、7 ~11 C、11 ~15 D、15 ~22 10、车用柴油机实际循环与下列( A )理论循环相似。 A、混合加热循环 B、定容加热循环 C、定压加热循环 D、卡诺循环 11、非增压发动机在一个工作循环中,缸内压力最低出现在(D )。 A、膨胀结束 B、排气终了 C、压缩初期 D、进气中期 12、自然吸气柴油机的压缩比范围为(D )。 A、8 ~16 B、10 ~18 C、12 ~20 D、14 ~22 3、发动机理论循环的假设燃烧是加热过程,其原因是( B )。 A、温度不变 B、工质不变 C、压力不变 D、容积不变 6、实际发动机的膨胀过程是一个多变过程,原因是在膨胀过程中,工质( C )。

高频电子线路复习题含答案

~学年第学期专业年级 高频电子线路课程期末考试题A卷 班级姓名学号 (一) 一、选择题(每小题2分、共30分)将一个正确选项前的字母填在括号内 1.在调谐放大器的LC回路两端并上一个电阻R,可以( C ) A.提高回路的Q值 B.提高谐振频率 C.加宽通频带D.减小通频带 2.在自激振荡电路中,下列哪种说法是正确的(C) A.LC振荡器、RC振荡器一定产生正弦波 B.石英晶体振荡器不能产生正弦波 C.电感三点式振荡器产生的正弦波失真较大 D.电容三点式振荡器的振荡频率做不高 3.如图为某收音机的变频级,以下正确叙述是( A ) A.电感三点式本机振荡电路 B.双回路调谐放大器取出中频信号 C.对接收信号构成共基放大电路 D.以上说法都不对 4.试用自激振荡的相位条件判别下图能产生自激振荡的电路

(D) A B C D 5.功率放大电路根据以下哪种说法可分为甲类、甲乙类、乙类、丙 类等( D ) A.电路特点 B.功率放大倍数 C.电流大小 D.功放管 静态工作点选择情况 6.用万用表欧姆档测量小功率三极管的电极时,应该把欧姆档拨到 (A) A.R×100或R×1k档 B.R×1档 C.R×10档 D.R ×10k档 7.若载波u C(t)=U C cosωC t,调制信号uΩ(t)= UΩcosΩt,则调频波 的 表 达 式 为 ( A

) A.u FM (t)=U C cos(ω C t+m f sinΩt) B.u FM (t)=U C cos(ω C t+m p cosΩt) C.u FM (t)=U C (1+m p cosΩt)cosω C t D.u FM (t)=kU Ω U C cosω C tcosΩt 8.MC1596集成模拟乘法器不可以用作( C ) A.振幅调制 B.调幅波的解调 C.频率调制D.混频 9.某超外差接收机的中频为465kHz,当接收931kHz的信号时,还收到1kHz的干扰信号,此干扰为( A ) A.干扰哨声 B.中频干扰 C.镜像干扰 D.交调干扰 10.混频电路又称变频电路,在变频过程中以下正确叙述是(C) A.信号的频谱结构发生变化 B.信号的调制类型发生变化 C.信号的载频发生变化 11.二极管峰值包络检波器,原电路正常工作。若加大调制频率Ω,会引起(A) A.惰性失真 B.底部切割失真 C.惰性失真和底部切割失真 12.AGC电路的作用是(C)

发动机试题及答案全套

.选择题(每个2分) 1.发动机排量是指发动机各气缸(A )的总和。 A.工作容积 B.燃烧室容积 C.总容积 D.浮子室容积 2.在冷却系中,( A )的作用是控制流经散热器的水量的元件。 A.节温器 B.水泵 C.旁通阀 D.储水罐 3.发动机的气缸壁采用(C )° A.润滑脂润滑 B.压力润滑 C.飞溅润滑 D.其它润滑 4.凸轮轴上凸轮的轮廓的形状决定于( B )。 A.气门的升程 B.气门的运动规律 C.气门的密封状况 D.气门的磨损规律 5.汽油的辛烷值表示汽油的( C )。 A.经济性 B.挥发性 C.抗爆性 D.燃烧性 6.发动机的压缩比是指(A 之比。 A.气缸总容积与燃烧室容积 B.气缸工作容积与燃烧室容积 C.发动机排量与燃烧室容积 D.气缸总容积与气缸工作容积 7.采用可变配气相位的目的是( A.提咼充气效率 B. 提高进气时间 C.减少污染 D.便于排气 8.四冲程V型六缸发动机的发火间隔角为(C ) A. 60 B. 90 C. 120 D. 180

9.进气门晚关的目的是(A )。 A.充分利用气流的惯性,增加进气量 B.减少进气阻力 C.排气更容易 D.减少进气量 10?某四冲程6缸发动机工作时, 凸轮轴旋转60转,该发动机第6 缸完成工作循环次数为(D ) A.30 次 B.40 次 C.50 次 D. 60 次 11.进、排气门在排气上止点时(D) A进气门开,排气门关 B.排气门开,进气门关 C进、排气门全关 D.进、排气门叠开 12..发动机中,活塞与连杆之间的活塞销主要起(C) A定位作用B过载保护作用C联接作用D防松作用 13?车用汽油发动机在大负荷和全负荷稳定工况时, 对可燃混合气 过量空气系数a的要求是(B) A.a=0.45~0.55 B . a=0.85~0.95 C. a=1.05~1.15 D . a=1.35~1.45 二.名词解释(每个 3 分) .1.空燃比 可燃混合气中空气质量与燃油质量之比为空燃比 2.气缸的工作容积

发动机原理试题以及答案

一、单项选择题 1、高速柴油机的实际循环接近于( D ) A、定压加热循环 B、定容加热循环 C、定温加热循环 D、混和加热循环 2、增加排气提前角会导致( C ) A、自由排气损失增加 B、强制排气损失增加 C、提前排气损失增加 D、换气损失增加 3、汽油机早燃的原因是混和气( C ) A、自燃 B、被火花塞点燃 C、被炽热表面点燃 D、被废气点燃 4、对自然吸气的四冲程内燃机,提高充气效率的措施中有( D ) A、提高进气气流速度 B、加大进气迟闭角 C、提高进气管内压力 D、合理选择进气迟闭角 5、为了保证新鲜工质顺利流入气缸,在活塞运动到上止点之前就打开气门。 从气门开启到上止点之间的角度称为( B ) A、排气门提前角 B、进气提前角 C、排气迟闭角 D、进气迟闭角 6、单位时间内燃烧的混合气数量是汽油机的( C ) A、火焰速度 B、点火速度 C、燃烧速度 D、混合速度 7、柴油机混合气形成的过程中,不使用的辅助手段是( D ) A、大压缩比 B、高压喷射 C、进气运动 D、加热进气道 8、压力升高率用于评价( B ) A、着火延迟期 B、速燃期 C、缓燃期 D、后燃期 9、四冲程发动机实际排气过程的持续长度( C ) A、小于180°曲轴转角 B、等于180°曲轴转角 C、大于180°曲轴转角 D、不小于180°曲轴转角 10、发动机的工况变化取决于其所带动的工作机械的( A ) A、运转情况 B、功率情况 C、速度情况 D、传动情况 11、柴油机出现不正常喷射的各种原因中包括( C ) A、高压油管过细 B、油管壁面过厚 C、喷油压力过高 D、喷油数量过多 12、描述发动机负荷特性时,不能代表负荷的参数是( A ) A、转速 B、功率 C、扭矩 D、油门位置 13、汽油机的燃烧过程人为地分为( C ) A、5个阶段 B、4个阶段 C、3个阶段 D、2个阶段 14、实际发动机的膨胀过程是( C ) A、定压过程 B、定温过程 C、多变过程 D、绝热过程 15、发动机的整机性能用有效指标表示,因为有效指标以( D ) A、燃料放出的热量为基础 B、气体膨胀的功为基础 C、活塞输出的功率为基础 D、曲轴输出的功率为基础 16、为了评价发动机进、排气过程中所消耗的有用功,引入的参数是( A ) A、泵气损失 B、传热损失 C、流动损失 D、机械损失 17、柴油机间接喷射式燃烧室类型中包括下面列出的( D ) A、半开式燃烧室 B、开式燃烧室 C、统一室燃烧室 D、预燃室燃烧室

高频电子线路试题库全套及答案

高频电子线路试题库及答案 一、单项选择题(每题2分,共20分) 第二章选频网络 1、LC串联电路处于谐振时,阻抗( B )。 A、最大 B、最小 C、不确定 2、LC并联谐振电路中,当工作频率大于、小于、等于谐振频率时,阻抗分别呈( B )。 A、感性容性阻性 B、容性感性阻性 C、阻性感性容性 D、感性阻性容性 3、在LC并联电路两端并联上电阻,下列说法错误的是( D ) A、改变了电路的谐振频率 B、改变了回路的品质因数 C、改变了通频带的大小 D、没有任何改变 第三章高频小信号放大器 1、在电路参数相同的情况下,双调谐回路放大器的通频带与单调谐回路放大器的通频带相比较A A、增大 B减小 C 相同D无法比较 2、三级相同的放大器级联,总增益为60dB,则每级的放大倍数为( D )。 A、10dB B、20 C、20 dB D、10 3、高频小信号谐振放大器不稳定的主要原因是(C ) (A)增益太大(B)通频带太宽(C)晶体管集电结电容C b’c的反馈作用(D)谐振曲线太尖锐。第四章非线性电路、时变参量电路和混频器 1、通常超外差收音机的中频为( A ) (A)465KH Z (B)75KH Z (C)1605KH Z (D)10.7MH Z 2、接收机接收频率为f c,f L>f c,f I为中频频率,则镜象干扰频率为( C ) (A)f c>f I (B)f L+f c (C)f c+2f I(D)f c+f I 3、设混频器的f L >f C,即f L =f C+f I ,若有干扰信号f n=f L+f I,则可能产生的干扰称为( D )。 (A)交调干扰(B)互调干扰(C)中频干扰(D)镜像干扰 4、乘法器的作用很多,下列中不属于其作用的是( D ) A、调幅 B、检波 C、变频 D、调频 5、混频时取出中频信号的滤波器应采用( A ) (A)带通滤波器(B)低通滤波器(C)高通滤波器(D)带阻滤波器 6、频谱线性搬移电路的关键部件是( B ) (A)相加器(B)乘法器(C)倍频器(D)减法器 7、在低电平调幅、小信号检波和混频中,非线性器件的较好特性是( C ) A、i=b0+b1u+b2u2+b3u3 B、i=b0+b1u+b3u3 C、i=b2u2 D、i=b3u3 8、我国调频收音机的中频为( D ) (A)465KH Z (B)455KH Z (C)75KH Z (D)10.7MH Z 9、在混频器的干扰中,组合副波道干扰是由于----------- 造成的。(A ) (A)有用信号与本振信号的组合(B)有用信号与干扰信号同时作用 (C)两个或多个干扰信号同时作用(D)外来干扰信号与本振信号的组合 第五章高频功率放大器 1、常用集电极电流流通角θ的大小来划分功放的工作类别,丙类功放( D )。(说明:θ为半导通角) (A)θ = 180O (B)90O<θ<180O (C)θ =90 O (D)θ<90O 2、谐振功率放大器与调谐放大器的区别是( C ) A、前者比后者电源电压高 B、前者比后者失真小 C、谐振功率放大器工作在丙类,调谐放大器工作在甲类 D、谐振功率放大器输入信号小,调谐放大器输入信号大 3、已知某高频功率放大器原工作在临界状态,当改变电源电压时,管子发热严重,说明功放管进入了A A欠压状态B过压状态C仍在临界状态 4、为了有效地实现集电极调幅,调制器必须工作在哪种工作状态( C )A、临界B、欠压C、过压

高频电子线路复习考试题及答案

2013—2014学年第二学期《高频电路》期末考试题(A) 使用教材:主编《高频电子线路》、适用班级:电信12 (4、5、6)命题人: 一、填空题(每空1分,共X分) I. 调幅的几种调制方式是AM、DSB、SSB。 3 .集电极调幅,应使被调放大器工作于过压_______ 态。 5. 电容三点式振荡器的发射极至集电极之间的阻抗Z ee性质应为容性,发射极至基极之间的阻抗Z be性质应为容性,基极至集电极之间的阻抗Z eb性质应为感性。 6. 通常将携带有信息的电信号称为调制信号,未调制的高频振荡信号称为载 波,通过调制后的高频振荡信号称为已调波。 8?解调是调制的逆过程。振幅调制信号的解调电路称为振幅检波电路,它的作用是从高频已调信号中恢复出调制信号。 9. LC串联谐振回路品质因数(Q)下降,频带变宽,选择性变差。 10. 某高频功率放大器原来工作在临界状态,测得U em=22v , G=100mA , R P =100 Q, E e =24v,当放大器的负载阻抗R P变小时,则放大器的工作状态 过渡到欠压状态,回路两端电压U em将减小,若负载阻抗增加时,则工作状 态由临界过渡到过压状态,回路两端电压5m将增大。 II. 常用的混频电路有二极管混频、三极管混频和模拟乘法器混频等。 12. 调相时,最大相位偏移与调制信号幅度成正比。 13. 模拟乘法器的应用很广泛,主要可用来实现调幅、解调和混频等频谱搬移电路中。 14. 调频和调幅相比,调频的主要优点是抗干扰性强、频带宽和调频发射机的功率放大器的利用率高。 15. 谐振功率放大器的负载特性是当V cc、V BB、V b m等维持不变时,电流、电压、功率和效率等随电阻R p的增加而变化的特性。 16. 混频器按所用非线性器件的不同,可分为二极管混频器、三极管混频器

AcFun正式会员答题修订版

AcFun注册正式会员游戏答题 1关于意见反馈,一下说法不正确的是?(A) A、意见反馈需要登录才能反馈 B.用户可以直接咨询客服 C.存在反馈快捷通道 D.意见反馈和举报效果一样 2、以下四个著名的动画业界人士,没有在动画业界童话《白箱》里出现过的是(A) A. 富野由悠季 B.庵野秀明 C.南雅彦 D.石川光久 3、《南方公园》中拥有无限复活能力的角色是?(D) A.斯坦 B.凯尔 C.卡特曼 D.肯尼 4、游戏《无主之地》系列中,帅哥杰克的面具下隐藏着?(B) A.外星人脸 B.秘藏标识 C.一模一样的脸 D.魔女的标识 5、评论才是?(C) A.下体 B.三体 C.本体 D.扁桃体 6、韩国男子组合bigbang的MV‘love song’,采用了一连贯的长镜头组成,但有一个破绽可以看出是MV后期合成的,这个破绽是?(C) A.崔胜贤的项链 B.姜大成的西装 C.权志龙的手表 D.东永斐的皮鞋

7、北斗之萨样指的是哪位日本声优?(A) A后藤邑子 B.后藤纱里绪 C.佐藤利奈 D.新井里美 8.以下哪位男性没有喜欢过吉安娜?普罗德摩尔?(B) A.阿尔萨斯 B.伊利丹 C.凯尔萨斯 D.萨尔 9、“葛炮”的原型人物,曾为哪部动画配音?(C) A.喜洋洋与灰太狼 B.熊出没 C.蓝猫淘气三千问 D.西游记 10、织田信长的绰号为?(C) A.第四天魔王 B.第五天魔王 C.第六天魔王 D.第七天魔王 11、A战的“阿婆主”指的是?C A.下载视频的人 B.观众 C.投稿的人 D.管理员 12.一下作品不属于漫画家岩明均所著的是?(D) A.七夕之国 B.历史之眼 C.寄生兽 D.无限之住人 13.导演水岛精二最近的一部剧场版动画名字是?(D) A.裸之催眠术师 B.EXODUS C.第三飞行少女队 D.乐园追放 14、一下LOL里没有中国元素的英雄是?(B)

相关主题